{"title":"Silver Packages","description":null,"products":[{"product_id":"cslb-electrical-c-10-license-study-guide-and-practice-exam","title":"CSLB Electrical (C-10): Study Guide and Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-electrical-c-10\"\u003eElectrical (C-10) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-electrical-c-10-license-practice-examination\"\u003eElectrical (C-10) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-10 contractor \"installs, erects, constructs, repairs, services, alters, adds to, or designs... electrical wiring, services, equipment, and apparatus for light, heat, and power.\" This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C10\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-10 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e — \u003ca href=\"\/pages\/electrical-c10-practice-test\"\u003eTry our free practice test\u003c\/a\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eAt what depth should U.F. cable be buried in the earth, given it has no supplemental protection?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 12\" · B. 18\" · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. 24\"\u003c\/strong\u003e · D. 36\"\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eThe larger the conductor, the:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Lower the ampacity · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. Lower the resistance\u003c\/strong\u003e · C. Higher the resistance · D. Higher the voltage\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eType UF cable shall not be used in:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Hoistways · B. Motion picture studios · C. Storage battery rooms · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. All of the above\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA shunt is used in parallel with a d. c. ammeter measuring large currents to:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. dampen the meter pointer · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. reduce the meter current\u003c\/strong\u003e · C. protect the meter against shorts · D. increase the sensitivity of the meter\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eThe minimum clearance from ground to service conductors over a public street is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 12' · B. 15' · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. 18'\u003c\/strong\u003e · D. 21'\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhen you check a 3 phase motor winding for polarity with a compass, the pointer should indicate:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. the same number of alternate north and south poles\u003c\/strong\u003e · B. the same number of alternate poles as there are phases · C. a north pointer deflection in the direction of rotation · D. a south pointer deflection in the direction of rotation\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":46036001226977,"sku":"peerless_electrical-c-10-silver-bundle","price":250.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-10-hero-silver.jpg?v=1776654608"},{"product_id":"framing-rough-carpentry-c-5-study-guide-online-practice-exam","title":"CSLB Framing and Rough Carpentry (C-5): Study Guide and Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-framing-rough-carpentry-c-5\"\u003eFraming \u0026amp; Rough Carpentry (C-5) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-framing-and-rough-carpentry-c-5-license-practice-examination\"\u003eFraming \u0026amp; Rough Carpentry (C-5) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-5 contractor \"frames and erects the structural components of a building or structure using wood or other recognized framing materials.\" This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C5\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-5 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e — \u003ca href=\"\/pages\/framing-c5-practice-test\"\u003eTry our free practice test\u003c\/a\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhat percent of moisture still remains in lumber that is considered to have a high-moisture content?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 9% · B. 10% · C. 15% · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. 19%\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhich of the following best describes \"a means of egress\"?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. An exit stair · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. An unobstructed path of travel out of a building\u003c\/strong\u003e · C. A hallway leading to an exterior door · D. A vestibule leading to the outside\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA hip rafter is how many inches deeper than common rafters?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 1\" · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. 2\"\u003c\/strong\u003e · C. 2-1\/2\" · D. 3\"\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003e3\/8 inch thick plywood with a span rating of 16\/0, used on a roof with rafters spaced 16 inches on center, shall have edges:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. supported · B. tapered · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. blocked\u003c\/strong\u003e · D. splined\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA beam that has one end fixed and the other end unsupported is called a:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. fixed beam · B. plank beam · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. cantilever\u003c\/strong\u003e · D. deck beam\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA beam that is supported at the ends and rests on one or more intermediate supports is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. a fixed beam · B. an overhanging beam · C. a simple beam · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. a continuous beam\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":46113515340001,"sku":"peerless_framing-rough-carpentry-c-5-silver-bundle","price":125.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-5-hero-silver.jpg?v=1776654610"},{"product_id":"ceramic-mosaic-tile-c-54-study-guide-online-practice-exam","title":"CSLB Ceramic and Mosaic Tile (C-54): Study Guide and Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-ceramic-mosaic-tile-c-54\"\u003eCeramic \u0026amp; Mosaic Tile (C-54) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-ceramic-and-mosaic-tile-c-54-license-practice-examination\"\u003eCeramic \u0026amp; Mosaic Tile (C-54) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-54 contractor selects, cuts, and installs ceramic, mosaic, quarry, and porcelain tile on floors, walls, countertops, and other surfaces. This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C54\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-54 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e — \u003ca href=\"\/pages\/ceramic-tile-c54-practice-test\"\u003eTry our free practice test\u003c\/a\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhat is the part of the wall from which the arch springs?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Extrados · B. Intrados · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. Pier\u003c\/strong\u003e · D. Spandrel\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eThe vertical distance between the spring points and the highest point of the soffit is called the:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. Rise\u003c\/strong\u003e · B. Skewback · C. Span · D. Spring line\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eThe name of the uppermost or central voussoir in an arch is the:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Bow · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. Key\u003c\/strong\u003e · C. Skewback · D. Springer\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eApplying tile directly to wood by means of a thin-set portland cement mortar with no base material between is not recommended, because:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. mortar dries out too fast · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. wood tends to move and the tile may shear off\u003c\/strong\u003e · C. mortar will not adhere to wood · D. wood absorbs all the mortar\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eBacking should be prepared in what manner, if mortar is applied over studs?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Use vapor barrier with 1 inch overlap · B. Use metal lath with 1 inch overlap · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. If the studs are more than 6 inches on center, tie wire should be installed\u003c\/strong\u003e · D. All of the above\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eBecause of a special treatment of the glaze and bisque, faience tiles have a:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. machined finish · B. thick base · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. handmade appearance\u003c\/strong\u003e · D. slick surface\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":46113522090209,"sku":"peerless_ceramic-mosaic-tile-c-54-silver-bundle","price":125.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-54-hero-silver.jpg?v=1776654611"},{"product_id":"flooring-c-15-study-guide-online-practice-exam","title":"CSLB Flooring and Floor Covering (C-15): Study Guide and Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-flooring-and-floor-covering-c-15\"\u003eFlooring \u0026amp; Floor Covering (C-15) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-flooring-and-floor-covering-c-15-license-practice-examination\"\u003eFlooring \u0026amp; Floor Covering (C-15) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-15 contractor installs, sands, finishes, and repairs carpet, resilient flooring, laminate, hardwood, and other floor coverings. This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C15\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-15 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e — \u003ca href=\"\/pages\/flooring-c15-practice-test\"\u003eTry our free practice test\u003c\/a\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhich type of backing is usually found on 1\/8\" vinyl tile?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Felt · B. Rubber · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. Burlap\u003c\/strong\u003e · D. Asphalt\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eThe most commonly used underlayment is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Saturated felt · B. Particle board · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. Plywood\u003c\/strong\u003e · D. Hardboard\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhich of the following is an outstanding characteristic of resilient flooring?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Floating chips · B. Translucency · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. Resiliency\u003c\/strong\u003e · D. Variety of colors\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA tile run number is coded to identify the plant that produced the tile along with the date, shift and:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. pattern · B. weight · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. batch number\u003c\/strong\u003e · D. size\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA tool that is recommended for repairing a raveled seam is a:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. hook knife · B. electric carpet cutter · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. two-bladed knife\u003c\/strong\u003e · D. razor knife\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA tool that may be used to fasten cove stick is a:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. drill · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. staple gun\u003c\/strong\u003e · C. pin machine · D. mallet\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":46113543684321,"sku":"peerless_flooring-floor-covering-c-15-silver-bundle","price":250.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-15-hero-silver.jpg?v=1776654613"},{"product_id":"fire-protection-engineering-c-16-study-guide-online-practice-exam","title":"CSLB Fire Protection (C-16): Study Guide and Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-fire-protection-engineering-c-16\"\u003eFire Protection Engineering (C-16) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-fire-protection-c-16-license-practice-examination\"\u003eFire Protection Engineering (C-16) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-16 contractor installs, repairs, and services fire protection systems including sprinkler systems, standpipes, fire pumps, and underground mains. This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C16\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-16 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e — \u003ca href=\"\/pages\/fire-protection-c16-practice-test\"\u003eTry our free practice test\u003c\/a\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eAt what temperature do in-rack sprinklers activate?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. 130 to 170 degrees F\u003c\/strong\u003e · B. 130 to 190 degrees F · C. 140 to 170 degrees F · D. 140 to 190 degrees F\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eHow often are fire pumps turned on and tested?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Daily · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. Once a week\u003c\/strong\u003e · C. Monthly · D. Once every 3 months\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003ePIV stands for:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Preaction intake valve · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. Post indicator valve\u003c\/strong\u003e · C. Pipe in view · D. Pipe in valve\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhat chemical can be used to stop a small leak in a sprinkler system during a hydrostatic test?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Sodium silicate · B. Sodium derivatives · C. Brine · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. You should not use anything\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eFor what is the Hazen-Williams Formula used?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Fire pump efficiency · B. Flow · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. Pressure loss\u003c\/strong\u003e · D. Velocity\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eAn electrical contractor uses the underground mains and sprinkler mains as an electrical ground. He has proceeded:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. correctly · B. incorrectly; only above-ground mains may be used for grounding · C. incorrectly; only sprinkler mains may be used · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. incorrectly; such mains must never be used as a ground because it may cause electrolysis\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":46115835740385,"sku":"peerless_fire-protection-c-16-silver-bundle","price":250.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-16-hero-silver.jpg?v=1776654615"},{"product_id":"landscaping-c-27-study-guide-online-practice-exam","title":"CSLB Landscaping (C-27): Study Guide and Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-landscaping-c-27\"\u003eLandscaping (C-27) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-landscaping-c-27-license-practice-examination\"\u003eLandscaping (C-27) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-27 contractor constructs, maintains, and repairs plots and areas of land including hardscapes, drainage systems, irrigation, planting, and retaining walls. This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C27\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-27 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e — \u003ca href=\"\/pages\/landscaping-c27-practice-test\"\u003eTry our free practice test\u003c\/a\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhy would you not want to waterproof a retaining wall?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. The water seeping through would discolor it · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. Water pressure would build up against the wall\u003c\/strong\u003e · C. It would become too wet on the low side · D. None of the above\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhat drain design should you use when draining a large flat area?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Grid · B. Parallel · C. Radial · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. Concentric circle\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eFor a two-story building, how deep in the soil must the footings be?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 12\" · B. 16\" · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. 18\"\u003c\/strong\u003e · D. 24\"\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhat is the cause if a ring of green lawn surrounds all of the sprinkler heads on a lawn?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. Excess water pressure\u003c\/strong\u003e · B. Wrong valve type · C. Mechanism is defective · D. Sprinkler head is too low\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eAfter sowing a newly seeded lawn, a thorough soaking is necessary and after that it should be watered:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. once per day · B. morning and evening · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. with a light sprinkling by hand applied 3 to 4 times a day\u003c\/strong\u003e · D. once a week\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eAfter the grass seed has germinated, the watering schedule should be adjusted:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. to gradually increase · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. to gradually decrease\u003c\/strong\u003e · C. by not watering until ready to mow · D. by watering heavily until ready to mow\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":46115891871969,"sku":"peerless_landscaping-c-27-silver-bundle","price":250.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-27-hero-silver.jpg?v=1776654616"},{"product_id":"hvac-c-20-study-guide-online-practice-exam","title":"CSLB HVAC (C-20): Study Guide and Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-heating-ventilating-a-c-c-20\"\u003eHVAC (C-20) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-hvac-warm-air-heating-ventilating-and-air-conditioning-c-20-license-practice-examination\"\u003eHVAC (C-20) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-20 contractor installs, services, and repairs forced-air heating, ventilating, and air conditioning systems, including ductwork, equipment, and refrigeration components. This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C20\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-20 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e — \u003ca href=\"\/pages\/hvac-c20-practice-test\"\u003eTry our free practice test\u003c\/a\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eIn 1 ton of air conditioning there are how many Btu's per hour?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 10,000 · B. 11,000 · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. 12,000\u003c\/strong\u003e · D. 15,000\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eTwo methods of evacuation are:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Deep and purging · B. Deep and vapor · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. Deep and triple\u003c\/strong\u003e · D. Deep and surface\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eThe mechanism that comprises both a service valve and a pressure gauge is a:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Selenium · B. Charging pulse · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. Testing manifold\u003c\/strong\u003e · D. Transformer\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA three pipe water system has which of the following?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 1 return, 1 supply and 1 reserve · B. 1 supply, 2 returns · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. 2 supplies, 1 return\u003c\/strong\u003e · D. 2 returns, 2 supplies\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA compressor in which compression is attained in a cylinder by rotation of a semiradial member is known as which of the following?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Compressor · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. Rotary compressor\u003c\/strong\u003e · C. Hermetic compressor · D. Open type compressor\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhich of the following describes series heating cooling circuits?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Single circuits · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. Combination circuits\u003c\/strong\u003e · C. 3 way circuits · D. 4 way circuits\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":46115893248225,"sku":"peerless_hvac-c-20-silver-bundle","price":250.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-20-hero-silver.jpg?v=1776654618"},{"product_id":"painting-and-decorating-c-33-study-guide-online-practice-exam","title":"CSLB Painting and Decorating (C-33): Study Guide and Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-painting-and-decorating-c-33\"\u003ePainting \u0026amp; Decorating (C-33) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-painting-and-decorating-c-33-license-practice-examination\"\u003ePainting \u0026amp; Decorating (C-33) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-33 contractor applies paints, varnishes, stains, primers, and specialty coatings to exterior and interior surfaces. This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C33\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-33 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e — \u003ca href=\"\/pages\/painting-c33-practice-test\"\u003eTry our free practice test\u003c\/a\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eProper surface preparation is necessary for:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Adequate bonding of coating · B. Full protection of substrate · C. Avoiding early paint failure · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. All of the above\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhich of the following presents the least coating problem?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. Surface texture\u003c\/strong\u003e · B. Sharp edges · C. Corners · D. Crevices\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhen is it most advantageous to use steel grit as an abrasive?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. When cleaning aluminum surfaces · B. When cleaning bronze surfaces · C. When grit need not be reclaimed · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. When cleaning ferrous metals\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhat is it called when painting is done around inside corners, window and door trim and along baseboard before rolling the rest of the wall?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Heeling · B. Fanning · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. Cutting in\u003c\/strong\u003e · D. Tipping\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA brush used to apply paste filler should have bristles that are:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. short and stiff\u003c\/strong\u003e · B. long and flexible · C. fiber · D. long and stiff\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA ceiling is 15' x 24'. How much paint should be purchased if the paint covers 300 sq. ft. per gallon?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. 1.2 gallons\u003c\/strong\u003e · B. .83 gallons · C. 2 gallons · D. 2.1 gallons\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":46115894690017,"sku":"peerless_painting-decorating-c-33-silver-bundle","price":250.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-33-hero-silver.jpg?v=1776654619"},{"product_id":"structural-steel-c-51-study-guide-online-practice-exam","title":"CSLB Structural Steel (C-51): Study Guide and Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-structural-steel-c-51\"\u003eStructural Steel (C-51) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-structural-steel-c-51-license-practice-examinations\"\u003eStructural Steel (C-51) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-51 contractor \"fabricates and erects structural steel shapes and plates of structural steel, including the riveting, welding, rigging and metal roofing systems necessary to perform this work.\" This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C51\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-51 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e — \u003ca href=\"\/pages\/structural-steel-c51-practice-test\"\u003eTry our free practice test\u003c\/a\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhen tightening bolts in a connection on posts and columns on a high rise, the proper sequence is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. From the outermost bolt · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. From the middle\u003c\/strong\u003e · C. From any location · D. All of the above\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003e414C refers to:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Screws · B. Steel posts · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. Bolts\u003c\/strong\u003e · D. Steel columns\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA maul is used for:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Driving bull pins and drift pins into connection holes · B. Straightening bent material · C. Hitting steel members into place · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. All of the above\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhen tightening bolts in a connection on posts and columns on a high rise, the proper sequence is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. from the outermost bolt · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. from the middle\u003c\/strong\u003e · C. from any location · D. all of the above\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eUntil they have been certified by a DOSH approved certifying agent, cranes with a capacity greater than ___ tons should not be used.\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 1 · B. 2 · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. 3\u003c\/strong\u003e · D. 4\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eAcetylene torch pressure should always be kept below:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 10 psi · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. 15 psi\u003c\/strong\u003e · C. 20 psi · D. 30 psi\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":46115906224353,"sku":"peerless_structural-steel-c-51-silver-bundle","price":250.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-51-hero-silver.jpg?v=1776654621"},{"product_id":"low-voltage-systems-c-7-study-guide-online-practice-exam","title":"CSLB Low Voltage Systems (C-7): Study Guide and Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-low-voltage-systems-c-7\"\u003eLow Voltage Systems (C-7) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-low-voltage-systems-c-7-license-practice-examination\"\u003eLow Voltage Systems (C-7) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-7 contractor installs, maintains, tests, and repairs systems that use 91 volts or less, including telephone, data, video, intercom, alarm, and control wiring systems. This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C7\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-7 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e — \u003ca href=\"\/pages\/low-voltage-c7-practice-test\"\u003eTry our free practice test\u003c\/a\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eFTTC stands for:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Fiber to the current · B. Fiber to the circuit · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. Fiber to the curb\u003c\/strong\u003e · D. Fiber to the CATV\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhy do you need Category 5e instead of Category 5?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. For greater strength for long pulls · B. To futureproof your network · C. For isolation in industrial networks · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. To run Gigabit Ethernet\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eCopper networks can be converted to fiber networks by using:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Patch panels · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. Media converters\u003c\/strong\u003e · C. Rewiring · D. Fiber hubs\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA convenient unit of measurement to compare the resistance and size of one conductor with another is the:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. ohm\u003c\/strong\u003e · B. mil-foot · C. wattage · D. voltage drop\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA GFCI breaker or receptacle will open a circuit where there is a current leakage to ground fault of:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. .06 · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. .006\u003c\/strong\u003e · C. .6 · D. .2\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA megohmmeter is used to test insulation resistance because it provides a:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. higher potential than an ohmmeter\u003c\/strong\u003e · B. multiple path for resistance · C. convenient means of recording resistance · D. wide range of resistance taps\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":46115941712097,"sku":"peerless_low-voltage-systems-c-7-silver-bundle","price":125.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-7-hero-silver.jpg?v=1776654623"},{"product_id":"masonry-c-29-study-guide-online-practice-exam","title":"CSLB Masonry (C-29): Study Guide and Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-masonry-c-29\"\u003eMasonry (C-29) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-masonry-c-29-license-practice-examination\"\u003eMasonry (C-29) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-29 contractor uses brick, stone, concrete block, and related materials to construct foundations, walls, fireplaces, and other masonry structures. This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C29\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-29 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e — \u003ca href=\"\/pages\/masonry-c29-practice-test\"\u003eTry our free practice test\u003c\/a\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eIn a 6\" × 8\" × 16\" CMU, the 16\" measurement refers to the block's:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Width · B. Height · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. Length\u003c\/strong\u003e (verified from ANSWERS key)\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eThe portion of a masonry wall above the roof line is called the:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. Parapet\u003c\/strong\u003e · B. Liftline · C. Flashing · D. Cant strip\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhen the outside air temperature is 20°F or below, masonry work requires:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Enclosures only · B. Auxiliary heat only · C. Enclosures or auxiliary heat · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. Enclosures and auxiliary heat\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eThe minimum compressive strength of Type N mortar in p.s.i. at 28 days is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 550 p.s.i · B. 650 p.s.i · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. 750 p.s.i\u003c\/strong\u003e · D. 850 p.s.i\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eThe three grades of facing brick are:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. FBX, FBS, FBA\u003c\/strong\u003e · B. FBX, FBE, FBA · C. FBX, FBE, FBS · D. FBA, FBE, FBS\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA bond made with several courses of stretchers followed by one coarse of either Flemish or full headers is called:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. English bond · B. Flemish bond · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. Common bond\u003c\/strong\u003e · D. Flemish garden bond\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":46115942891745,"sku":"peerless_masonry-c-29-silver-bundle","price":125.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-29-hero-silver.jpg?v=1776654624"},{"product_id":"drywall-c-9-study-guide-online-practice-exam-1","title":"CSLB Drywall (C-9): Study Guide and Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-drywall-c-9\"\u003eDrywall (C-9) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-drywall-c-9-license-practice-examination\"\u003eDrywall (C-9) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-9 contractor \"installs, tapes, textures, and finishes drywall, gypsum board, and other similar rigid wallboard.\" This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C9\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-9 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e — \u003ca href=\"\/pages\/drywall-c9-practice-test\"\u003eTry our free practice test\u003c\/a\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eFor semisolid partitions, nailing blocks should be spaced:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 12\" · B. 16\" · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. 24\"\u003c\/strong\u003e · D. 30\"\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eBlocking behind the tub to support sheetrock is installed by the:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Plumber · B. Drywall mechanic · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. Framer\u003c\/strong\u003e · D. Tile setter\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhich type of resistance does double-layer gypsum board provide?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. Sound and fire\u003c\/strong\u003e · B. Sound and waterproofing · C. Waterproofing and fire · D. Security and sound\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA bugle head screw attaches multi-layer gypsum board to steel framing up to what gauge?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 12 · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. 14\u003c\/strong\u003e · C. 16 · D. 24\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eFasteners for applying metal trim should be spaced a maximum of how many inches o.c.?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 14\" · B. 12\" · C. 10\" · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. 9\"\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eFinishing compound should be applied with tools of sufficient width to extend at least how many inch(es) beyond both sides of the center of the joint tape?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. 6\u003c\/strong\u003e · B. 5 · C. 4 · D. 3\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":46115944169697,"sku":"peerless_drywall-c-9-silver-bundle-2","price":125.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-9-hero-silver.jpg?v=1776654626"},{"product_id":"concrete-c-8-study-guide-online-practice-exam","title":"CSLB Concrete (C-8): Study Guide and Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-concrete-c-8\"\u003eConcrete (C-8) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-concrete-c-8-license-practice-examination\"\u003eConcrete (C-8) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-8 contractor \"forms, pours, places, finishes and installs specified mass, pavement, flat and other concrete work; and places and sets screeds for pavements or flatwork.\" This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C-8\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-8 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e — \u003ca href=\"\/pages\/concrete-c8-practice-test\"\u003eTry our free practice test\u003c\/a\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eConcrete is kept moist to enhance:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Cooling · B. Heating · C. Water tightness · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. Curing\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eProper curing will help produce concrete that is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Hard · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. Water tight\u003c\/strong\u003e · C. Prestressed · D. Frozen\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA material that may be used for curing is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Asphalt paper · B. Plaster board · C. Plywood · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. Waterproof paper or plastic\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA 6 cu. yd. load of concrete weighs 22,842 lbs. What is the unit weight of the concrete?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 121 lb.\/cu. ft. · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. 141 lb.\/cu. ft.\u003c\/strong\u003e · C. 282 lb.\/cu. ft. · D. 564 lb.\/cu. ft.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003e6 × 6 – 10 × 10 welded-wire fabric has:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 10-inch wire spacing · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. unequal wire spacing\u003c\/strong\u003e · C. 6-inch wire spacing · D. No. 6 gauge transverse wires\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA caisson is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. a cast-in-place pile\u003c\/strong\u003e · B. an underwater footing · C. a continuous footing · D. none of the above\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":46115965141217,"sku":"peerless_concrete-c-8-silver-bundle","price":250.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-8-hero-silver.jpg?v=1776654628"},{"product_id":"cabinet-millwork-and-finish-carpentry-c-6-study-guide-and-online-practice-exam","title":"CSLB Cabinet, Millwork and Finish Carpentry (C-6): Study Guide and Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-cabinet-millwork-finished-carpentry-c-6\"\u003eCabinet, Millwork \u0026amp; Finish Carpentry (C-6) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-cabinet-millwork-and-finish-carpentry-c-6-license-practice-examination\"\u003eCabinet, Millwork \u0026amp; Finish Carpentry (C-6) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-6 contractor \"constructs, fabricates, and installs all types of cabinetry, countertops, and other millwork and finish carpentry items.\" This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C6\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-6 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e — \u003ca href=\"\/pages\/cabinets-c6-practice-test\"\u003eTry our free practice test\u003c\/a\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eThe front entrance to a house should be at least:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 38\" wide · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. 36\" wide\u003c\/strong\u003e · C. 35\" wide · D. 34\" wide\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhich of the following is most true? More than 2\/3 of all wooden stock windows and doors are manufactured from:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Fir · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. Ponderosa pine\u003c\/strong\u003e · C. Sugar pine · D. Idaho white pine\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eExterior door thickness for residences is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 1-1\/2\" · B. 1-5\/8\" · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. 1-3\/4\"\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA disadvantage of stains is that they:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. tend to hide the grain of the wood · B. cannot be redone once applied · C. give unstable colors · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. bleed through coatings based on similar solvents\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA filled and sealed wood surface can be given an antique look by applying:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. shading · B. spattering · C. highlighting · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. glaze\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA finished joint's strength and the drying time for glue is determined by:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. the wood's moisture content\u003c\/strong\u003e · B. the way that the glue is used · C. how the joint fits · D. the application of the glue\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":47936527827169,"sku":"peerless_cabinet-millwork-finish-carpentry-c-6-silver-bundle-2","price":250.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-6-hero-silver.jpg?v=1776654629"},{"product_id":"earthwork-and-paving-c-12-study-guide-and-online-practice-exam","title":"CSLB Earthwork and Paving (C-12): Study Guide and Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-earthwork-paving-c-12\"\u003eEarthwork \u0026amp; Paving (C-12) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-earthwork-and-paving-c-12-license-practice-examination\"\u003eEarthwork \u0026amp; Paving (C-12) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-12 contractor \"grades, clears, and prepares land surfaces; excavates, fills, and compacts earthwork, including grading for roads, streets, and other paved areas.\" This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C12\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-12 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e — \u003ca href=\"\/pages\/earthwork-c12-practice-test\"\u003eTry our free practice test\u003c\/a\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA lime treatment is usually called for when the soil is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Cohesive · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. Clay\u003c\/strong\u003e · C. Loam · D. Acid\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eThe minimum allowance in compaction is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 80% · B. 85% · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. 90%\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA method that is generally accepted for improving soils is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Compaction · B. Density and kneading action · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. Lateral or subdrainage\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhich of the following would be required when using blasting powder?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. ability to read english · B. safety glasses · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. a permit to use it\u003c\/strong\u003e · D. all of the above\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhen bell and spigot cast iron pipe is to be laid in a trench which has been mechanically excavated, the \"bell-holes\" are usually dug by:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. a bulldozer · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. hand\u003c\/strong\u003e · C. a dragline · D. a trencher\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhat is the next step after ripping, when ripping and re-compacting existing road?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. spread the ripped asphalt · B. roll the ripped asphalt · C. crush the ripped asphalt · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. scrape the ripped asphalt into windows\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":47936528941281,"sku":"peerless_earthwork-paving-c-12-silver-bundle","price":125.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-12-hero-silver.jpg?v=1776654630"},{"product_id":"glazing-c-17-study-guide-and-online-practice-exam","title":"CSLB Glazing (C-17): Study Guide and Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-glazing-c-17\"\u003eGlazing (C-17) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-glazing-c-17-license-practice-examination\"\u003eGlazing (C-17) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-17 contractor selects, cuts, fits, and installs all types of glass, glazing, and related materials including curtain walls, storefronts, and structural glazing systems. This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C17\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-17 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e — \u003ca href=\"\/pages\/glazing-c17-practice-test\"\u003eTry our free practice test\u003c\/a\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eGlass is installed in unit walls:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. In the shop · B. Inside the building · C. Outside the building · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. At the factory\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eThe maximum area of any single piece of glass in a safety glazing location is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 4 sq. ft. · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. 6 sq. ft.\u003c\/strong\u003e · C. 8 sq. ft. · D. 10 sq. ft.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhich of the following materials should not be used as a glazing surface?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Stone · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. Aluminum\u003c\/strong\u003e · C. Brick · D. Concrete\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhen shifting the position of a lite of glass you should use:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. suction cups\u003c\/strong\u003e · B. a crowbar · C. a screwdriver · D. any of the above\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhat is the typical \"bite\" of 3\/4 inch monolithic glass?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 1\/2\" · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. 5\/8\"\u003c\/strong\u003e · C. 3\/4\" · D. 1\"\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eLateral shims are used to control:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. face clearance\u003c\/strong\u003e · B. bite clearance · C. edge Clearance · D. all of the above\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":47936531005665,"sku":"peerless_glazing-c-17-silver-bundle","price":125.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-17-hero-silver.jpg?v=1776654632"},{"product_id":"building-moving-and-demolition-c-21-electrical-c-10-study-guide-and-online-practice-exam","title":"CSLB Building Moving and Demolition (C-21): Study Guide and Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-building-moving-demolition-c-21\"\u003eBuilding, Moving \u0026amp; Demolition (C-21) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-building-moving-and-demolition-c-21-license-practice-examination\"\u003eBuilding, Moving \u0026amp; Demolition (C-21) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-21 contractor \"raises, lowers, cribs, underpins, demolishes and moves or removes structures, including their foundations.\" This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C21\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-21 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e — \u003ca href=\"\/pages\/moving-demo-c21-practice-test\"\u003eTry our free practice test\u003c\/a\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhat kind of fire extinguisher should be used on an asphalt roof fire?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Foam · B. Soda acid · C. Carbon dioxide · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. Dry chemical\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhich of the following fire extinguishers cannot be used to put out a Class B fire?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Foam · B. Ordinary dry chemical · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. Gas cartridge\u003c\/strong\u003e · D. Carbon dioxide\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhich type of extinguisher contains a solution of aluminum sulfate and bicarbonate of soda?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. Foam\u003c\/strong\u003e · B. Ordinary dry chemical · C. Gas cartridge · D. Carbon dioxide\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eFor explosive blast, which can't be used as the source of current?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. a blasting machine · B. light circuit · C. power circuit · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. storage batteries\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003ePedestrian protection must be in place prior to demolishing a building. What protection is required, if the height of construction being removed is more than 8' high?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. a distance of more than half of the construction fence height · B. a distance of less than 6' canopy and fence · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. a distance of not more than a quarter the height of the construction fence\u003c\/strong\u003e · D. a safe walkway around the structure of 4 feet in width\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eAll glazed openings shall be removed a minimum of ___ the working level, when a hazard occurs from glass fragmentation.\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. 1 floor below\u003c\/strong\u003e · B. 1 floor above · C. a floor equal to · D. none of the above\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":47936539623649,"sku":"peerless_building-moving-demolition-c-21-silver-bundle","price":250.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-21-hero-silver.jpg?v=1776654634"},{"product_id":"plumbing-c-36-study-guide-and-online-practice-exam","title":"CSLB Plumbing (C-36): Study Guide and Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-plumbing-c-36\"\u003ePlumbing (C-36) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-plumbing-c-36-license-practice-examination\"\u003ePlumbing (C-36) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-36 contractor installs, alters, and repairs water supply systems, drainage systems, gas lines, sewers, and plumbing fixtures in residential and commercial structures. This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C36\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-36 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e — \u003ca href=\"\/pages\/plumbing-c36-practice-test\"\u003eTry our free practice test\u003c\/a\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eUnless listed as flammable-vapor-ignition-resistant, how high above a residential garage floor must a gas water heater’s pilots, burners, and burner-igniter devices be installed?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 12 inches · \u003cstrong style=\"color: #2d7a2d;\"\u003eB. 18 inches ✓\u003c\/strong\u003e · C. 24 inches · D. 36 inches\u003cbr\u003e\u003csmall\u003eAnswer basis: \u003ca href=\"https:\/\/www.cityofsacramento.gov\/content\/dam\/portal\/cdd\/Building\/Forms\/CDD-0250_Residential-Building-Code-Requirements.pdf\" target=\"_blank\" rel=\"noopener\"\u003e2025 CPC §507.13\u003c\/a\u003e.\u003c\/small\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eUnder the 2025 California Plumbing Code, what is the maximum permitted distance between gas utilization equipment and its accessible manual shutoff valve?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 3 feet · B. 4 feet · \u003cstrong style=\"color: #2d7a2d;\"\u003eC. 6 feet ✓\u003c\/strong\u003e · D. 10 feet\u003cbr\u003e\u003csmall\u003eAnswer basis: \u003ca href=\"https:\/\/www.cityofsacramento.gov\/content\/dam\/portal\/cdd\/Building\/Forms\/CDD-0250_Residential-Building-Code-Requirements.pdf\" target=\"_blank\" rel=\"noopener\"\u003e2025 CPC §1212.6\u003c\/a\u003e.\u003c\/small\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eOf the following, which single-wall appliance vent connection is permitted?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Horizontally in a plastered partition · B. Vertically through the attic · C. Vertically through the floor to the roof · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. Through the exterior wall to the outer air\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eThe minimum size strap for a hot water heater is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 1\"- 20 gauge · B. 1-1\/4\"- 18 gauge · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. 1-1\/2\"-16 gauge\u003c\/strong\u003e · D. 2\"-16 gauge\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhat is the typical daily water usage per person in a home?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 15 gallons · B. 25 gallons · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. 50 gallons\u003c\/strong\u003e · D. 75 gallons\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eTo test for leaks in a gas piping system use:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. a flame · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. a solution of soapy water\u003c\/strong\u003e · C. a sharp nose · D. a canary\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":47936547029217,"sku":"peerless_plumbing-c-36-silver-bundle-2","price":250.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-36-hero-silver.jpg?v=1776663893"},{"product_id":"roofing-c-39-study-guide-book-online-practice-exam","title":"CSLB Roofing (C-39): Study Guide and Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-roofing-c-39\"\u003eRoofing (C-39) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-roofing-c-39-license-practice-exam\"\u003eRoofing (C-39) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-39 contractor applies all types of roofing, waterproofing, and weatherproofing materials to buildings and structures. This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C39\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-39 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e — \u003ca href=\"\/pages\/roofing-c39-practice-test\"\u003eTry our free practice test\u003c\/a\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eThe slope of a built-up asphalt roof should not exceed what pitch when aggregate is applied?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 6\/12 · B. 4\/12 · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. 3\/12\u003c\/strong\u003e · D. 1\/12\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhat may roofing cut corners be used on?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Inside corners · B. Angles · C. Outside corners · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. All of the above\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhat is one of the greatest causes of roofing deterioration?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Wind · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. Ultraviolet rays from the sun\u003c\/strong\u003e · C. Rain · D. Air pollution\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":48664504402145,"sku":"peerless_roofing-c-39-silver-bundle-2","price":125.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-39-hero-silver-v2_543c1873-c242-4f00-965f-c291a92acd1a.jpg?v=1784414449"},{"product_id":"swimming-pool-c-53-study-guide-book-online-practice-exam","title":"CSLB Swimming Pool (C-53): Study Guide and Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-swimming-pool-c-53\"\u003eSwimming Pool (C-53) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-swimming-pool-c-53-license-practice-exam\"\u003eSwimming Pool (C-53) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-53 contractor designs, constructs, and services swimming pools, spas, hot tubs, and related water features including excavation, plumbing, gunite, electrical, and pool equipment. This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C53\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-53 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e — \u003ca href=\"\/pages\/swimming-pools-c53-practice-test\"\u003eTry our free practice test\u003c\/a\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eNSPI stands for:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Non-standard Pool Inspection · B. Normal Swimming Pool Installation · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. National Spa and Pool Institute\u003c\/strong\u003e · D. National Swimming Pool Industry\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eIf the soils surrounding a pool are slow draining, what type of soil is present?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Clay · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. Gravel\u003c\/strong\u003e · C. Sand · D. Cement grout\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhen beginning excavation for a swimming pool, where do you start?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Where the skimmer will be · B. The deep end · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. The shallow end\u003c\/strong\u003e · D. Where the main drain will be\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":48664504762593,"sku":"peerless_swimming-pool-c-53-silver-bundle-2","price":250.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-53-hero-silver-v2_601bc34e-6c12-4a9d-948b-9143d2760023.jpg?v=1784414440"},{"product_id":"cslb-law-and-business-study-guide-and-online-practice-exam","title":"CSLB Law and Business: Study Guide and Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-book-law-business\"\u003eLaw and Business Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-law-and-business-license-practice-examination\"\u003eLaw and Business Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eThe Law \u0026amp; Business exam is required for all California contractor license applicants, regardless of trade — it tests the rules, regulations, and business practices the state requires every licensed contractor to know. \u003ca href=\"https:\/\/www.cslb.ca.gov\/Contractors\/Applicants\/Examination_Process\/\" rel=\"noopener\" target=\"_blank\"\u003eSee the official CSLB Law \u0026amp; Business examination\u003c\/a\u003e. This printed book covers the subjects the state tests.\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e — \u003ca href=\"\/pages\/law-and-business-practice-test\"\u003eTry our free practice test\u003c\/a\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eMr. Smith has approached contractor Mr. Jones asking for a bid on the construction of a building for which Mr. Smith has drawn plans. Mr. Jones has found numerous items in the plans that conflict with current building codes, but Mr. Smith has said that he wants the building to be built exactly as he has drawn the plans. Mr. Jones, a contractor, should therefore:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. advise Mr. Smith that the building code must be followed, even if he loses the job\u003c\/strong\u003e · B. take the job but build according to code · C. consult with Mr. Smith's wife · D. build it the way the owner wishes\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA  construction contract was written containing  the following time estimates to complete the job.  It would take 2 days to ready the construction site and then the job itself would be done in 2 phases.  The first phase would take 10 days and the second would take 7 days, but these 2 phases could be at the same time.  It would take one additional day at the end to clean up.  How many days would it take to complete this project?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 15 days · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. 13 days\u003c\/strong\u003e · C. 11 days · D. 7 days\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA  contractor receives a notice from  the  Employment Development Department (EDD) that one of his  former employees has filed a claim for Unemployment Insurance (UI) benefits against his reserve account.  He\/she may:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. call EDD within 5 days and protest · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. protest, in writing, within 10 days of the mailing date of the notice\u003c\/strong\u003e · C. protest, in writing, within 30 days of the mailing date · D. protest, in writing, within 45 days of the mailing date\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA  Stop Notice, which is a claim for payment to  a subcontractor, inhibits payment from:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. the prime contractor to the subcontractor · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. the property owner to the prime contractor\u003c\/strong\u003e · C. the property owner to the subcontractor · D. the property owner to the supplier of materials\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA \"class 2\" fire hazard means there is\/are  ______ present.\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. flammable material\u003c\/strong\u003e · B. dust · C. textiles · D. all of the above\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":48963296264417,"sku":"peerless_law-business-silver-bundle","price":250.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-law-hero-bronze-study-guide.jpg?v=1782705477"},{"product_id":"cslb-general-building-b-study-guide-and-online-practice-exam","title":"CSLB General Building (B): Study Guide and Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-general-building-b\"\u003eGeneral Building (B) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-general-building-b-license-practice-examination\"\u003eGeneral Building (B) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a B contractor may \"contract to construct or superintend or engage in the construction of any building, highway, road, parking facility, railroad, excavation, or other structure.\" \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=B\" rel=\"noopener\" target=\"_blank\"\u003eSee the official CSLB B classification\u003c\/a\u003e. This printed book covers the subjects the state tests.\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e — \u003ca href=\"\/pages\/general-building-b-practice-test\"\u003eTry our free practice test\u003c\/a\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eInsulation is installed only after the:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. rough framing inspection · B. plumbing is complete · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. rough wiring is complete\u003c\/strong\u003e · D. rough plumbing is complete\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhat is the largest hole that can be drilled in a double stud?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 25 percent of the stud · B. 30 percent of the stud · C. 40 percent of the stud · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. 60 percent of the stud\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhat is the minimum nailing spacing on the outer edge of the sheetrock?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 3\/8\" from edge: 6 in. o.c · B. 1\/2\" from edge: 12 in. o.c · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. 3\/8\" from edge: 8 in o.c\u003c\/strong\u003e · D. 1\/2\" from edge: 8 in. o.c\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhich of the following is a vertical window in a projection built out from a sloping roof?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. A lintel · B. A gable · C. A gambrel · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. A dormer\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhich of the following is used to fasten a mudsill to the foundation?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 12\" bolts · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. 10\" bolts\u003c\/strong\u003e · C. 8\" bolts · D. 6\" bolts\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":48963317268705,"sku":"peerless_general-building-b-silver-bundle","price":250.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-b-hero-bronze-study-guide.jpg?v=1782755161"},{"product_id":"cslb-general-engineering-a-study-guide-and-online-practice-exam","title":"CSLB General Engineering (A): Study Guide and Online Practice Exam","description":"\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-general-engineering-a\"\u003eGeneral Engineering (A) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-general-engineering-a-license-practice-examination\"\u003eGeneral Engineering (A) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, an A contractor performs \"construction, alteration, demolition, repair, or improvement to any public or private building or structure\" — specifically earthwork, grading, paving, underground work, and structural steel. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=A\" rel=\"noopener\" target=\"_blank\"\u003eSee the official CSLB A classification\u003c\/a\u003e. This printed book covers the subjects the state tests.\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e — \u003ca href=\"\/pages\/general-engineering-a-practice-test\"\u003eTry our free practice test\u003c\/a\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eUnless otherwise stated, paving asphalt shall be applied at a temperature of not more than:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 300 degrees F · B. 325 degrees F · C. 350 degrees F · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. 375 degrees F\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhen spreading a course with a motor grader blade, the main advantage is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. the self-leveling trait · B. the geometric coverage and gentleness of the ride · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. the longer wheel base prevents bumps, sags and irregularities\u003c\/strong\u003e · D. none of the above\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhich of the following is a vertical window in a projection built out from a sloping roof?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. A lintel · B. A gable · C. A gambrel · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. A dormer\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhich of the following would you use to cut asphalt to make it more flexible?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Solvent · B. Naphtha · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. Kerosene\u003c\/strong\u003e · D. Thinner\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eSix-six-ten-ten welded-wire reinforcement has:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 10 inch wire spacing · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. 6 inch wire spacing\u003c\/strong\u003e · C. unequal wire spacing · D. No. 6 gauge transverse wires\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":48963325198561,"sku":"peerless_general-engineering-a-silver-bundle","price":250.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-a-hero-bronze-study-guide.jpg?v=1782755159"}],"url":"https:\/\/peerlessinstitute.com\/collections\/silver-packages.oembed","provider":"Peerless Institute","version":"1.0","type":"link"}