{"product_id":"building-moving-and-demolition-c-21-electrical-c-10-study-guide-and-online-practice-exam-law-and-business-online-practice-exam","title":"Building, Moving, and Demolition (C-21) Study Guide and Online Practice Exam + Law and Business Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-building-moving-demolition-c-21\"\u003eBuilding, Moving \u0026amp; Demolition (C-21) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-building-moving-and-demolition-c-21-license-practice-examination\"\u003eBuilding, Moving \u0026amp; Demolition (C-21) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003eRequired for all California contractor applicants: \u003ca href=\"\/products\/cslb-law-and-business-license-practice-examination\"\u003eLaw \u0026amp; Business Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-21 contractor \"raises, lowers, cribs, underpins, demolishes and moves or removes structures, including their foundations.\" This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C21\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-21 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhat kind of fire extinguisher should be used on an asphalt roof fire?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Foam · B. Soda acid · C. Carbon dioxide · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. Dry chemical\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhich of the following fire extinguishers cannot be used to put out a Class B fire?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Foam · B. Ordinary dry chemical · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. Gas cartridge\u003c\/strong\u003e · D. Carbon dioxide\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhich type of extinguisher contains a solution of aluminum sulfate and bicarbonate of soda?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. Foam\u003c\/strong\u003e · B. Ordinary dry chemical · C. Gas cartridge · D. Carbon dioxide\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eFor explosive blast, which can't be used as the source of current?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. a blasting machine · B. light circuit · C. power circuit · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. storage batteries\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003ePedestrian protection must be in place prior to demolishing a building. What protection is required, if the height of construction being removed is more than 8' high?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. a distance of more than half of the construction fence height · B. a distance of less than 6' canopy and fence · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. a distance of not more than a quarter the height of the construction fence\u003c\/strong\u003e · D. a safe walkway around the structure of 4 feet in width\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eAll glazed openings shall be removed a minimum of ___ the working level, when a hazard occurs from glass fragmentation.\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. 1 floor below\u003c\/strong\u003e · B. 1 floor above · C. a floor equal to · D. none of the above\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003e[Law \u0026amp; Business] A construction contract was written containing the following time estimates to complete the job. It would take 2 days to ready the construction site and then the job itself would be done in 2 phases. The first phase would take 10 days and the second would take 7 days, but these 2 phases could be at the same time. It would take one additional day at the end to clean up. How many days would it take to complete this project?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 15 days · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. 13 days\u003c\/strong\u003e · C. 11 days · D. 7 days\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003e[Law \u0026amp; Business] A contractor receives a notice from the Employment Development Department (EDD) that one of his former employees has filed a claim for Unemployment Insurance (UI) benefits against his reserve account. He\/she may:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. call EDD within 5 days and protest · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. protest, in writing, within 10 days of the mailing date of the notice\u003c\/strong\u003e · C. protest, in writing, within 30 days of the mailing date · D. protest, in writing, within 45 days of the mailing date\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":47936533561569,"sku":"peerless_building-moving-demolition-c-21-gold-bundle","price":320.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-21-hero-gold.jpg?v=1776654665","url":"https:\/\/peerlessinstitute.com\/products\/building-moving-and-demolition-c-21-electrical-c-10-study-guide-and-online-practice-exam-law-and-business-online-practice-exam","provider":"Peerless Institute","version":"1.0","type":"link"}