{"product_id":"concrete-c-8-study-guide-and-online-practice-exam-law-and-business-online-practice-exam","title":"Concrete (C-8) Study Guide Book and Online Practice Exam + Law and Business Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-concrete-c-8\"\u003eConcrete (C-8) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-concrete-c-8-license-practice-examination\"\u003eConcrete (C-8) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003eRequired for all California contractor applicants: \u003ca href=\"\/products\/cslb-law-and-business-license-practice-examination\"\u003eLaw \u0026amp; Business Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-8 contractor \"forms, pours, places, finishes and installs specified mass, pavement, flat and other concrete work; and places and sets screeds for pavements or flatwork.\" This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C-8\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-8 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eConcrete is kept moist to enhance:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Cooling · B. Heating · C. Water tightness · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. Curing\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eProper curing will help produce concrete that is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Hard · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. Water tight\u003c\/strong\u003e · C. Prestressed · D. Frozen\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA material that may be used for curing is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Asphalt paper · B. Plaster board · C. Plywood · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. Waterproof paper or plastic\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA 6 cu. yd. load of concrete weighs 22,842 lbs. What is the unit weight of the concrete?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 121 lb.\/cu. ft. · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. 141 lb.\/cu. ft.\u003c\/strong\u003e · C. 282 lb.\/cu. ft. · D. 564 lb.\/cu. ft.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003e6 × 6 – 10 × 10 welded-wire fabric has:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 10-inch wire spacing · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. unequal wire spacing\u003c\/strong\u003e · C. 6-inch wire spacing · D. No. 6 gauge transverse wires\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA caisson is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. a cast-in-place pile\u003c\/strong\u003e · B. an underwater footing · C. a continuous footing · D. none of the above\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003e[Law \u0026amp; Business] A construction contract was written containing the following time estimates to complete the job. It would take 2 days to ready the construction site and then the job itself would be done in 2 phases. The first phase would take 10 days and the second would take 7 days, but these 2 phases could be at the same time. It would take one additional day at the end to clean up. How many days would it take to complete this project?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 15 days · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. 13 days\u003c\/strong\u003e · C. 11 days · D. 7 days\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003e[Law \u0026amp; Business] A contractor receives a notice from the Employment Development Department (EDD) that one of his former employees has filed a claim for Unemployment Insurance (UI) benefits against his reserve account. He\/she may:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. call EDD within 5 days and protest · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. protest, in writing, within 10 days of the mailing date of the notice\u003c\/strong\u003e · C. protest, in writing, within 30 days of the mailing date · D. protest, in writing, within 45 days of the mailing date\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":47911212122337,"sku":"peerless_concrete-c-8-gold-bundle","price":320.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-8-hero-gold.jpg?v=1776654658","url":"https:\/\/peerlessinstitute.com\/products\/concrete-c-8-study-guide-and-online-practice-exam-law-and-business-online-practice-exam","provider":"Peerless Institute","version":"1.0","type":"link"}