{"product_id":"cslb-electrical-c-10-license-study-guide-and-practice-exam","title":"Electrical (C-10) Study Guide Book + Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-electrical-c-10\"\u003eElectrical (C-10) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-electrical-c-10-license-practice-examination\"\u003eElectrical (C-10) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-10 contractor \"installs, erects, constructs, repairs, services, alters, adds to, or designs... electrical wiring, services, equipment, and apparatus for light, heat, and power.\" This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C10\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-10 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eAt what depth should U.F. cable be buried in the earth, given it has no supplemental protection?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 12\" · B. 18\" · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. 24\"\u003c\/strong\u003e · D. 36\"\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eThe larger the conductor, the:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Lower the ampacity · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. Lower the resistance\u003c\/strong\u003e · C. Higher the resistance · D. Higher the voltage\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eType UF cable shall not be used in:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Hoistways · B. Motion picture studios · C. Storage battery rooms · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. All of the above\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA shunt is used in parallel with a d. c. ammeter measuring large currents to:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. dampen the meter pointer · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. reduce the meter current\u003c\/strong\u003e · C. protect the meter against shorts · D. increase the sensitivity of the meter\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eThe minimum clearance from ground to service conductors over a public street is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 12' · B. 15' · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. 18'\u003c\/strong\u003e · D. 21'\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhen you check a 3 phase motor winding for polarity with a compass, the pointer should indicate:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. the same number of alternate north and south poles\u003c\/strong\u003e · B. the same number of alternate poles as there are phases · C. a north pointer deflection in the direction of rotation · D. a south pointer deflection in the direction of rotation\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":46036001226977,"sku":"peerless_electrical-c-10-silver-bundle","price":220.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-10-hero-silver.jpg?v=1776654608","url":"https:\/\/peerlessinstitute.com\/products\/cslb-electrical-c-10-license-study-guide-and-practice-exam","provider":"Peerless Institute","version":"1.0","type":"link"}