{"product_id":"earthwork-and-paving-c-12-study-guide-and-online-practice-exam-law-and-business-online-practice-exam","title":"Earthwork and Paving (C-12) Study Guide Book and Online Practice Exam + Law and Business Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-earthwork-paving-c-12\"\u003eEarthwork \u0026amp; Paving (C-12) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-earthwork-and-paving-c-12-license-practice-examination\"\u003eEarthwork \u0026amp; Paving (C-12) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003eRequired for all California contractor applicants: \u003ca href=\"\/products\/cslb-law-and-business-license-practice-examination\"\u003eLaw \u0026amp; Business Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-12 contractor \"grades, clears, and prepares land surfaces; excavates, fills, and compacts earthwork, including grading for roads, streets, and other paved areas.\" This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C12\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-12 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA lime treatment is usually called for when the soil is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Cohesive · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. Clay\u003c\/strong\u003e · C. Loam · D. Acid\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eThe minimum allowance in compaction is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 80% · B. 85% · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. 90%\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA method that is generally accepted for improving soils is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Compaction · B. Density and kneading action · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. Lateral or subdrainage\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhich of the following would be required when using blasting powder?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. ability to read english · B. safety glasses · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. a permit to use it\u003c\/strong\u003e · D. all of the above\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhen bell and spigot cast iron pipe is to be laid in a trench which has been mechanically excavated, the \"bell-holes\" are usually dug by:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. a bulldozer · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. hand\u003c\/strong\u003e · C. a dragline · D. a trencher\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhat is the next step after ripping, when ripping and re-compacting existing road?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. spread the ripped asphalt · B. roll the ripped asphalt · C. crush the ripped asphalt · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. scrape the ripped asphalt into windows\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003e[Law \u0026amp; Business] A construction contract was written containing the following time estimates to complete the job. It would take 2 days to ready the construction site and then the job itself would be done in 2 phases. The first phase would take 10 days and the second would take 7 days, but these 2 phases could be at the same time. It would take one additional day at the end to clean up. How many days would it take to complete this project?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 15 days · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. 13 days\u003c\/strong\u003e · C. 11 days · D. 7 days\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003e[Law \u0026amp; Business] A contractor receives a notice from the Employment Development Department (EDD) that one of his former employees has filed a claim for Unemployment Insurance (UI) benefits against his reserve account. He\/she may:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. call EDD within 5 days and protest · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. protest, in writing, within 10 days of the mailing date of the notice\u003c\/strong\u003e · C. protest, in writing, within 30 days of the mailing date · D. protest, in writing, within 45 days of the mailing date\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":47936529891553,"sku":"peerless_earthwork-paving-c-12-gold-bundle","price":320.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-12-hero-gold.jpg?v=1776654661","url":"https:\/\/peerlessinstitute.com\/products\/earthwork-and-paving-c-12-study-guide-and-online-practice-exam-law-and-business-online-practice-exam","provider":"Peerless Institute","version":"1.0","type":"link"}