{"product_id":"electrical-c-10-study-guide-and-online-practice-exam-law-and-business-online-practice-exam","title":"Electrical (C-10) Study Guide Book and Online Practice Exam + Law and Business Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-electrical-c-10\"\u003eElectrical (C-10) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-electrical-c-10-license-practice-examination\"\u003eElectrical (C-10) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003eRequired for all California contractor applicants: \u003ca href=\"\/products\/cslb-law-and-business-license-practice-examination\"\u003eLaw \u0026amp; Business Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-10 contractor \"installs, erects, constructs, repairs, services, alters, adds to, or designs... electrical wiring, services, equipment, and apparatus for light, heat, and power.\" This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C10\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-10 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eAt what depth should U.F. cable be buried in the earth, given it has no supplemental protection?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 12\" · B. 18\" · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. 24\"\u003c\/strong\u003e · D. 36\"\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eThe larger the conductor, the:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Lower the ampacity · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. Lower the resistance\u003c\/strong\u003e · C. Higher the resistance · D. Higher the voltage\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eType UF cable shall not be used in:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Hoistways · B. Motion picture studios · C. Storage battery rooms · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. All of the above\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA shunt is used in parallel with a d. c. ammeter measuring large currents to:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. dampen the meter pointer · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. reduce the meter current\u003c\/strong\u003e · C. protect the meter against shorts · D. increase the sensitivity of the meter\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eThe minimum clearance from ground to service conductors over a public street is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 12' · B. 15' · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. 18'\u003c\/strong\u003e · D. 21'\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhen you check a 3 phase motor winding for polarity with a compass, the pointer should indicate:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. the same number of alternate north and south poles\u003c\/strong\u003e · B. the same number of alternate poles as there are phases · C. a north pointer deflection in the direction of rotation · D. a south pointer deflection in the direction of rotation\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003e[Law \u0026amp; Business] A construction contract was written containing the following time estimates to complete the job. It would take 2 days to ready the construction site and then the job itself would be done in 2 phases. The first phase would take 10 days and the second would take 7 days, but these 2 phases could be at the same time. It would take one additional day at the end to clean up. How many days would it take to complete this project?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 15 days · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. 13 days\u003c\/strong\u003e · C. 11 days · D. 7 days\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003e[Law \u0026amp; Business] A contractor receives a notice from the Employment Development Department (EDD) that one of his former employees has filed a claim for Unemployment Insurance (UI) benefits against his reserve account. He\/she may:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. call EDD within 5 days and protest · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. protest, in writing, within 10 days of the mailing date of the notice\u003c\/strong\u003e · C. protest, in writing, within 30 days of the mailing date · D. protest, in writing, within 45 days of the mailing date\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":46057538224353,"sku":"peerless_electrical-c-10-gold-bundle","price":320.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-10-hero-gold.jpg?v=1776654637","url":"https:\/\/peerlessinstitute.com\/products\/electrical-c-10-study-guide-and-online-practice-exam-law-and-business-online-practice-exam","provider":"Peerless Institute","version":"1.0","type":"link"}