{"product_id":"fire-protection-engineering-c-16-study-guide-and-online-practice-exam-law-and-business-online-practice-exam","title":"Fire Protection Engineering (C-16) Study Guide Book and Online Practice Exam + Law and Business Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-fire-protection-engineering-c-16\"\u003eFire Protection Engineering (C-16) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-fire-protection-c-16-license-practice-examination\"\u003eFire Protection Engineering (C-16) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003eRequired for all California contractor applicants: \u003ca href=\"\/products\/cslb-law-and-business-license-practice-examination\"\u003eLaw \u0026amp; Business Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-16 contractor installs, repairs, and services fire protection systems including sprinkler systems, standpipes, fire pumps, and underground mains. This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C16\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-16 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eAt what temperature do in-rack sprinklers activate?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. 130 to 170 degrees F\u003c\/strong\u003e · B. 130 to 190 degrees F · C. 140 to 170 degrees F · D. 140 to 190 degrees F\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eHow often are fire pumps turned on and tested?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Daily · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. Once a week\u003c\/strong\u003e · C. Monthly · D. Once every 3 months\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003ePIV stands for:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Preaction intake valve · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. Post indicator valve\u003c\/strong\u003e · C. Pipe in view · D. Pipe in valve\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhat chemical can be used to stop a small leak in a sprinkler system during a hydrostatic test?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Sodium silicate · B. Sodium derivatives · C. Brine · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. You should not use anything\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eFor what is the Hazen-Williams Formula used?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Fire pump efficiency · B. Flow · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. Pressure loss\u003c\/strong\u003e · D. Velocity\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eAn electrical contractor uses the underground mains and sprinkler mains as an electrical ground. He has proceeded:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. correctly · B. incorrectly; only above-ground mains may be used for grounding · C. incorrectly; only sprinkler mains may be used · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. incorrectly; such mains must never be used as a ground because it may cause electrolysis\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003e[Law \u0026amp; Business] A construction contract was written containing the following time estimates to complete the job. It would take 2 days to ready the construction site and then the job itself would be done in 2 phases. The first phase would take 10 days and the second would take 7 days, but these 2 phases could be at the same time. It would take one additional day at the end to clean up. How many days would it take to complete this project?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 15 days · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. 13 days\u003c\/strong\u003e · C. 11 days · D. 7 days\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003e[Law \u0026amp; Business] A contractor receives a notice from the Employment Development Department (EDD) that one of his former employees has filed a claim for Unemployment Insurance (UI) benefits against his reserve account. He\/she may:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. call EDD within 5 days and protest · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. protest, in writing, within 10 days of the mailing date of the notice\u003c\/strong\u003e · C. protest, in writing, within 30 days of the mailing date · D. protest, in writing, within 45 days of the mailing date\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":46115838197985,"sku":"peerless_fire-protection-c-16-gold-bundle","price":320.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-16-hero-gold.jpg?v=1776654647","url":"https:\/\/peerlessinstitute.com\/products\/fire-protection-engineering-c-16-study-guide-and-online-practice-exam-law-and-business-online-practice-exam","provider":"Peerless Institute","version":"1.0","type":"link"}