{"product_id":"plumbing-c-36-study-guide-and-online-practice-exam-law-and-business-online-practice-exam","title":"Plumbing (C-36) Study Guide Book and Online Practice Exam + Law and Business Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-plumbing-c-36\"\u003ePlumbing (C-36) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-plumbing-c-36-license-practice-examination\"\u003ePlumbing (C-36) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003eRequired for all California contractor applicants: \u003ca href=\"\/products\/cslb-law-and-business-license-practice-examination\"\u003eLaw \u0026amp; Business Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-36 contractor installs, alters, and repairs water supply systems, drainage systems, gas lines, sewers, and plumbing fixtures in residential and commercial structures. This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C36\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-36 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eHow many cubic feet of gas does it take to produce one BTU?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 10 · B. 20 · C. 30 · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. 40 cubic feet\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eThe maximum distance from a gas appliance to its shut-off valve is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 2 feet · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. 3 feet\u003c\/strong\u003e · C. 5 feet · D. 6 feet\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eOf the following, which single-wall appliance vent connection is permitted?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Horizontally in a plastered partition · B. Vertically through the attic · C. Vertically through the floor to the roof · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. Through the exterior wall to the outer air\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eThe minimum size strap for a hot water heater is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 1\"- 20 gauge · B. 1-1\/4\"- 18 gauge · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. 1-1\/2\"-16 gauge\u003c\/strong\u003e · D. 2\"-16 gauge\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhat is the typical daily water usage per person in a home?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 15 gallons · B. 25 gallons · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. 50 gallons\u003c\/strong\u003e · D. 75 gallons\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eTo test for leaks in a gas piping system use:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. a flame · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. a solution of soapy water\u003c\/strong\u003e · C. a sharp nose · D. a canary\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003e[Law \u0026amp; Business] A construction contract was written containing the following time estimates to complete the job. It would take 2 days to ready the construction site and then the job itself would be done in 2 phases. The first phase would take 10 days and the second would take 7 days, but these 2 phases could be at the same time. It would take one additional day at the end to clean up. How many days would it take to complete this project?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 15 days · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. 13 days\u003c\/strong\u003e · C. 11 days · D. 7 days\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003e[Law \u0026amp; Business] A contractor receives a notice from the Employment Development Department (EDD) that one of his former employees has filed a claim for Unemployment Insurance (UI) benefits against his reserve account. He\/she may:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. call EDD within 5 days and protest · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. protest, in writing, within 10 days of the mailing date of the notice\u003c\/strong\u003e · C. protest, in writing, within 30 days of the mailing date · D. protest, in writing, within 45 days of the mailing date\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":46057543237857,"sku":"peerless_plumbing-c-36-gold-bundle","price":320.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-36-hero-gold.jpg?v=1776663886","url":"https:\/\/peerlessinstitute.com\/products\/plumbing-c-36-study-guide-and-online-practice-exam-law-and-business-online-practice-exam","provider":"Peerless Institute","version":"1.0","type":"link"}