{"product_id":"structural-steel-c-51-study-guide-and-online-practice-exam-law-and-business-online-practice-exam","title":"Structural Steel (C-51) Study Guide Book and Online Practice Exam + Law and Business Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/products\/peerless-study-guide-structural-steel-c-51\"\u003eStructural Steel (C-51) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/products\/cslb-structural-steel-c-51-license-practice-examinations\"\u003eStructural Steel (C-51) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003eRequired for all California contractor applicants: \u003ca href=\"\/products\/cslb-law-and-business-license-practice-examination\"\u003eLaw \u0026amp; Business Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-51 contractor \"fabricates and erects structural steel shapes and plates of structural steel, including the riveting, welding, rigging and metal roofing systems necessary to perform this work.\" This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C51\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-51 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhen tightening bolts in a connection on posts and columns on a high rise, the proper sequence is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. From the outermost bolt · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. From the middle\u003c\/strong\u003e · C. From any location · D. All of the above\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003e414C refers to:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Screws · B. Steel posts · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. Bolts\u003c\/strong\u003e · D. Steel columns\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA maul is used for:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Driving bull pins and drift pins into connection holes · B. Straightening bent material · C. Hitting steel members into place · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. All of the above\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhen tightening bolts in a connection on posts and columns on a high rise, the proper sequence is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. from the outermost bolt · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. from the middle\u003c\/strong\u003e · C. from any location · D. all of the above\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eUntil they have been certified by a DOSH approved certifying agent, cranes with a capacity greater than ___ tons should not be used.\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 1 · B. 2 · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. 3\u003c\/strong\u003e · D. 4\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eAcetylene torch pressure should always be kept below:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 10 psi · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. 15 psi\u003c\/strong\u003e · C. 20 psi · D. 30 psi\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003e[Law \u0026amp; Business] A construction contract was written containing the following time estimates to complete the job. It would take 2 days to ready the construction site and then the job itself would be done in 2 phases. The first phase would take 10 days and the second would take 7 days, but these 2 phases could be at the same time. It would take one additional day at the end to clean up. How many days would it take to complete this project?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 15 days · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. 13 days\u003c\/strong\u003e · C. 11 days · D. 7 days\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003e[Law \u0026amp; Business] A contractor receives a notice from the Employment Development Department (EDD) that one of his former employees has filed a claim for Unemployment Insurance (UI) benefits against his reserve account. He\/she may:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. call EDD within 5 days and protest · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. protest, in writing, within 10 days of the mailing date of the notice\u003c\/strong\u003e · C. protest, in writing, within 30 days of the mailing date · D. protest, in writing, within 45 days of the mailing date\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":46115906683105,"sku":"peerless_structural-steel-c-51-gold-bundle","price":320.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-51-hero-gold.jpg?v=1776654654","url":"https:\/\/peerlessinstitute.com\/products\/structural-steel-c-51-study-guide-and-online-practice-exam-law-and-business-online-practice-exam","provider":"Peerless Institute","version":"1.0","type":"link"}