{"title":"Electrical (C-10) Exam Prep","description":"\u003cp\u003ePeerless study guide book, online practice exam, and bundle options for the California C-10 Electrical contractor license exam.\u003c\/p\u003e","products":[{"product_id":"peerless-study-guide-electrical-c-10","title":"Peerless Study Guide Book: Electrical (C-10)","description":"\u003cp\u003e\u003cstrong\u003eWhat this book covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eThe Peerless Electrical (C-10) Study Guide Book prepares you for the trade portion of the California CSLB contractor license exam. Per the state's classification, a C-10 contractor \"installs, erects, constructs, repairs, services, alters, adds to, or designs... electrical wiring, services, equipment, and apparatus for light, heat, and power.\" This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C10\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C10 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eBook chapters\u003c\/strong\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003eService entrance\u003c\/li\u003e\n\u003cli\u003eGround-fault circuit interrupters\u003c\/li\u003e\n\u003cli\u003eTransformers\u003c\/li\u003e\n\u003cli\u003eElectrical materials\u003c\/li\u003e\n\u003cli\u003eElectrical tools \u0026amp; equipment\u003c\/li\u003e\n\u003cli\u003eElectrical code\u003c\/li\u003e\n\u003cli\u003ePhotovoltaic (PV) power systems\u003c\/li\u003e\n\u003cli\u003ePlans \u0026amp; specifications\u003c\/li\u003e\n\u003cli\u003eMathematics review\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eAt what depth should U.F. cable be buried in the earth, given it has no supplemental protection?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 12\" · B. 18\" · \u003cstrong style=\"color: #2d7a2d;\"\u003eC. 24\" ✓\u003c\/strong\u003e · D. 36\"\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eThe larger the conductor, the:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Lower the ampacity · \u003cstrong style=\"color: #2d7a2d;\"\u003eB. Lower the resistance ✓\u003c\/strong\u003e · C. Higher the resistance · D. Higher the voltage\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eType UF cable shall not be used in:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Hoistways · B. Motion picture studios · C. Storage battery rooms · \u003cstrong style=\"color: #2d7a2d;\"\u003eD. All of the above ✓\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"My Store","offers":[{"title":"Default Title","offer_id":45971029754081,"sku":"770008","price":120.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-10-hero-bronze-study-guide.jpg?v=1782705472"},{"product_id":"cslb-electrical-c-10-license-study-guide-and-practice-exam","title":"Electrical (C-10) Study Guide Book + Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/ru\/products\/peerless-study-guide-electrical-c-10\"\u003eElectrical (C-10) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/ru\/products\/cslb-electrical-c-10-license-practice-examination\"\u003eElectrical (C-10) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-10 contractor \"installs, erects, constructs, repairs, services, alters, adds to, or designs... electrical wiring, services, equipment, and apparatus for light, heat, and power.\" This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C10\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-10 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eAt what depth should U.F. cable be buried in the earth, given it has no supplemental protection?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 12\" · B. 18\" · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. 24\"\u003c\/strong\u003e · D. 36\"\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eThe larger the conductor, the:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Lower the ampacity · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. Lower the resistance\u003c\/strong\u003e · C. Higher the resistance · D. Higher the voltage\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eType UF cable shall not be used in:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Hoistways · B. Motion picture studios · C. Storage battery rooms · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. All of the above\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA shunt is used in parallel with a d. c. ammeter measuring large currents to:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. dampen the meter pointer · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. reduce the meter current\u003c\/strong\u003e · C. protect the meter against shorts · D. increase the sensitivity of the meter\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eThe minimum clearance from ground to service conductors over a public street is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 12' · B. 15' · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. 18'\u003c\/strong\u003e · D. 21'\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhen you check a 3 phase motor winding for polarity with a compass, the pointer should indicate:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. the same number of alternate north and south poles\u003c\/strong\u003e · B. the same number of alternate poles as there are phases · C. a north pointer deflection in the direction of rotation · D. a south pointer deflection in the direction of rotation\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":46036001226977,"sku":"peerless_electrical-c-10-silver-bundle","price":220.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-10-hero-silver.jpg?v=1776654608"},{"product_id":"electrical-c-10-study-guide-and-online-practice-exam-law-and-business-online-practice-exam","title":"Electrical (C-10) Study Guide and Online Practice Exam + Law and Business Study Guide and Online Practice Exam","description":"\u003cp\u003e\u003cstrong\u003eWhat’s included\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLearn the material: \u003ca href=\"\/ru\/products\/peerless-study-guide-electrical-c-10\"\u003eElectrical (C-10) Study Guide Book\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003ePass the test: \u003ca href=\"\/ru\/products\/cslb-electrical-c-10-license-practice-examination\"\u003eElectrical (C-10) Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003eRequired for all California contractor applicants: \u003ca href=\"https:\/\/peerlessinstitute.com\/products\/peerless-study-guide-book-law-business\"\u003eLaw \u0026amp; Business Study Guide Book\u003c\/a\u003e and \u003ca href=\"\/ru\/products\/cslb-law-and-business-license-practice-examination\"\u003eLaw \u0026amp; Business Practice Exam\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eWhat this covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePer the state's classification, a C-10 contractor \"installs, erects, constructs, repairs, services, alters, adds to, or designs... electrical wiring, services, equipment, and apparatus for light, heat, and power.\" This printed book covers the subjects the state tests. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C10\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C-10 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eAt what depth should U.F. cable be buried in the earth, given it has no supplemental protection?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 12\" · B. 18\" · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. 24\"\u003c\/strong\u003e · D. 36\"\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eThe larger the conductor, the:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Lower the ampacity · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. Lower the resistance\u003c\/strong\u003e · C. Higher the resistance · D. Higher the voltage\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eType UF cable shall not be used in:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. Hoistways · B. Motion picture studios · C. Storage battery rooms · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. All of the above\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA shunt is used in parallel with a d. c. ammeter measuring large currents to:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. dampen the meter pointer · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. reduce the meter current\u003c\/strong\u003e · C. protect the meter against shorts · D. increase the sensitivity of the meter\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eThe minimum clearance from ground to service conductors over a public street is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 12' · B. 15' · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. 18'\u003c\/strong\u003e · D. 21'\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhen you check a 3 phase motor winding for polarity with a compass, the pointer should indicate:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. the same number of alternate north and south poles\u003c\/strong\u003e · B. the same number of alternate poles as there are phases · C. a north pointer deflection in the direction of rotation · D. a south pointer deflection in the direction of rotation\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003e[Law \u0026amp; Business] A construction contract was written containing the following time estimates to complete the job. It would take 2 days to ready the construction site and then the job itself would be done in 2 phases. The first phase would take 10 days and the second would take 7 days, but these 2 phases could be at the same time. It would take one additional day at the end to clean up. How many days would it take to complete this project?\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 15 days · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. 13 days\u003c\/strong\u003e · C. 11 days · D. 7 days\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003e[Law \u0026amp; Business] A contractor receives a notice from the Employment Development Department (EDD) that one of his former employees has filed a claim for Unemployment Insurance (UI) benefits against his reserve account. He\/she may:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. call EDD within 5 days and protest · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. protest, in writing, within 10 days of the mailing date of the notice\u003c\/strong\u003e · C. protest, in writing, within 30 days of the mailing date · D. protest, in writing, within 45 days of the mailing date\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"Peerless Institute","offers":[{"title":"Default Title","offer_id":46057538224353,"sku":"peerless_electrical-c-10-gold-bundle","price":320.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/category-c-10-hero-gold.jpg?v=1776654637"},{"product_id":"cslb-electrical-c-10-license-practice-examination","title":"CSLB Electrical (C-10) License: Practice Examination","description":"\u003cp\u003e\u003cstrong\u003eWhat this exam covers\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003ePractice questions for the California CSLB Electrical (C-10) license exam, delivered online and graded instantly. Per the state's classification, a C-10 contractor installs, erects, constructs, repairs, services, alters, adds to, or designs electrical wiring, services, equipment, and apparatus for light, heat, and power. Works on any device, including iPad. \u003ca href=\"https:\/\/www.cslb.ca.gov\/about_us\/library\/licensing_classifications\/Licensing_Classifications_Detail.aspx?Class=C10\" target=\"_blank\" rel=\"noopener\"\u003eSee the official CSLB C10 classification\u003c\/a\u003e.\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003e9 exams · over 950 questions\u003c\/strong\u003e\u003c\/p\u003e\n\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eSample questions\u003c\/strong\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eA shunt is used in parallel with a d. c. ammeter measuring large currents to:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. dampen the meter pointer · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. reduce the meter current\u003c\/strong\u003e · C. protect the meter against shorts · D. increase the sensitivity of the meter\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eThe minimum clearance from ground to service conductors over a public street is:\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 12' · B. 15' · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ C. 18'\u003c\/strong\u003e · D. 21'\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eWhen you check a 3 phase motor winding for polarity with a compass, the pointer should indicate :\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003e\u003cstrong style=\"color: #2d7a2d;\"\u003e✓ A. the same number of alternate north and south poles\u003c\/strong\u003e · B. the same number of alternate poles as there are phases · C. a north pointer deflection in the direction of rotation · D. a south pointer deflection in the direction of rotation\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eElectric-discharge lighting mounted on poles or other structures outdoors and supplied by circuits exceeding 277V nominal to ground, but not exceeding 600V phase-to-phase, must have a minimum height of _______ft above the grade, roadway, etc.\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. 10 · B. 12 · C. 18 · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ D. 22\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e\u003cem\u003eTo measure the voltage across a load, you would use a(n):\u003c\/em\u003e\u003c\/strong\u003e\u003cbr\u003eA. voltmeter in series with the load · \u003cstrong style=\"color: #2d7a2d;\"\u003e✓ B. voltmeter across the load \u003c\/strong\u003e · C. ammeter across the load  · D. ammeter in series with the load\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"LearnWorlds","offers":[{"title":"Default Title","offer_id":47596434653409,"sku":"learnworlds_package_69662fd0d286f","price":120.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0725\/5929\/6737\/files\/a1ada04971599810b254510471ffad07_cab721c5-d3f5-4fd0-8028-7c5e0c8681dd.jpg?v=1784174656"}],"url":"https:\/\/peerlessinstitute.com\/ru\/collections\/c-10-electrical.oembed","provider":"Peerless Institute","version":"1.0","type":"link"}