样题 — 尝试我们的免费模拟测试

  1. 绝缘材料仅在以下情况之后安装:
    A. 粗木结构检查 · B. 水暖施工完成 · ✓ C. 粗布线完成 · D. 粗水暖施工完成
  2. 在双立柱上可钻的最大孔径是多少?
    A. 立柱的 25% · B. 立柱的 30% · C. 立柱的 40% · ✓ D. 立柱的 60%
  3. 石膏板外边缘的最小钉子间距是多少?
    A. 离边缘 3/8 英寸:6 英寸中心距 · B. 离边缘 1/2 英寸:12 英寸中心距 · ✓ C. 离边缘 3/8 英寸:8 英寸中心距 · D. 离边缘 1/2 英寸:8 英寸中心距
  4. 以下哪项是从倾斜屋顶突出的垂直窗户?
    A. 过梁 · B. 山墙 · C. 复折式屋顶 · ✓ D. 老虎窗
  5. 以下哪项用于将泥基梁固定到地基上?
    A. 12 英寸螺栓 · ✓ B. 10 英寸螺栓 · C. 8 英寸螺栓 · D. 6 英寸螺栓

Practice with diagrams

33 diagrams in General Building (B) online practice

Read a sample diagram, choose an answer, then reveal the explanation. The online course includes diagram questions with feedback.

Existing floor EL 100.00 ft; addition structural deck EL 99.50 ft. Section notes: topping 4 in and finish 1/2 in. Finish schedule: 1 in. Door-head underside EL 106.75 ft.
Addition floor-elevation tie-in · Open full-size diagram

Try a sample question

Using the section’s half-inch finish and 4-in topping, before resolving the schedule conflict, what is the addition finished-floor elevation?

  1. 99.875 ft
  2. 100.00 ft
  3. 99.50 ft
  4. 99.8333 ft
Show answer and explanation

A. 99.875 ft

The total assembly is 4.5 in = 0.375 ft. Add to 99.50 ft for 99.875 ft.

Practice with diagrams

28 diagrams in Law and Business online practice

Read a sample diagram, choose an answer, then reveal the explanation. The online course includes diagram questions with feedback.

Weekly cash-flow table. Opening cash is $15,000. W1/W2/W3 receipts: $0/$10,000/$18,000. Payments: $12,000/$8,000/$6,000. Calculate closing balances and carry them forward.
Job cash flow and payment timing · Open full-size diagram

Try a sample question

What is cash at the end of W1?

  1. $15,000
  2. $27,000
  3. $3,000
  4. $12,000
Show answer and explanation

C. $3,000

15,000 − 12,000 = 3,000.

通过考试的加州承包商

Good price, good material, and I passed. That is all I wanted.

Andres San Diego, CA  · General Building (B); Law & Business

Passed both. The Gold package had everything I needed, and the technical drawings in the building guide were the part I used most.

Reid Ventura, CA  · General Building (B); Law & Business

I am a woman in construction and I wanted to do this the right way. I studied hard, used the practice exams, and passed both.

Beatriz La Crescenta, CA  · General Building (B); Law & Business