Skip to content

CSLB Concrete (C-8): Online Practice Exam

$150.00
Choose your prep level
✓ This product selected $150.00

30 diagrams in Concrete (C-8) online practice

What this exam covers

Practice questions for the California CSLB Concrete (C-8) license exam, delivered online and graded instantly. Per the state's classification, a C-8 contractor "forms, pours, places, finishes and installs specified mass, pavement, flat and other concrete work; and places and sets screeds for pavements or flatwork." Works on any device, including iPad. See the official CSLB C-8 classification.


Updated July 2026 - 446 questions - Topic practice

  • Content Last Updated: July 24, 2026
  • Code Basis: 2022 California Codes
  • Question Count: 446 practice questions
  • Organized By: CSLB study-guide topic categories
  • Includes: This practice exam has been updated using Peerless’s vetted usable question set. Questions are organized by CSLB study-guide topic categories and include answer explanations to support full-exam review and focused topic practice. Each topic has a mini-exam to help you develop mastery.

Sample questions: Try our free practice test

  1. A 6 cu. yd. load of concrete weighs 22,842 lbs. What is the unit weight of the concrete?
    A. 121 lb./cu. ft. · ✓ B. 141 lb./cu. ft. · C. 282 lb./cu. ft. · D. 564 lb./cu. ft.
  2. 6 × 6 – 10 × 10 welded-wire fabric has:
    A. 10-inch wire spacing · ✓ B. unequal wire spacing · C. 6-inch wire spacing · D. No. 6 gauge transverse wires
  3. A caisson is:
    ✓ A. a cast-in-place pile · B. an underwater footing · C. a continuous footing · D. none of the above

Practice with diagrams

30 diagrams in Concrete (C-8) online practice

Read a sample diagram, choose an answer, then reveal the explanation. The online course includes diagram questions with feedback.

A slab plan splits two adjacent rectangular placement zones of different total depths.
Stepped slab placement zones · Open full-size diagram

Try a sample question

What is Zone A volume, rounded to .01 yd³?

  1. 7.90 yd³
  2. 11.85 yd³
  3. 3.95 yd³
  4. 5.93 yd³
Show answer and explanation

C. 3.95 yd³

20×16×4/12÷27 = 3.95 yd³.