Skip to content

CSLB Electrical (C-10): Study Guide and Online Practice Exam

$199.00 $300.00 Save $101.00 Free Shipping

36 diagrams in Electrical (C-10) online practice

What’s included


What this covers

Per the state's classification, a C-10 contractor "installs, erects, constructs, repairs, services, alters, adds to, or designs... electrical wiring, services, equipment, and apparatus for light, heat, and power." This printed book covers the subjects the state tests. See the official CSLB C-10 classification.


Sample questions: Try our free practice test

  1. At what depth should U.F. cable be buried in the earth, given it has no supplemental protection?
    A. 12" · B. 18" · ✓ C. 24" · D. 36"
  2. The larger the conductor, the:
    A. Lower the ampacity · ✓ B. Lower the resistance · C. Higher the resistance · D. Higher the voltage
  3. Type UF cable shall not be used in:
    A. Hoistways · B. Motion picture studios · C. Storage battery rooms · ✓ D. All of the above
  4. A shunt is used in parallel with a d. c. ammeter measuring large currents to:
    A. dampen the meter pointer · ✓ B. reduce the meter current · C. protect the meter against shorts · D. increase the sensitivity of the meter
  5. The minimum clearance from ground to service conductors over a public street is:
    A. 12' · B. 15' · ✓ C. 18' · D. 21'
  6. When you check a 3 phase motor winding for polarity with a compass, the pointer should indicate:
    ✓ A. the same number of alternate north and south poles · B. the same number of alternate poles as there are phases · C. a north pointer deflection in the direction of rotation · D. a south pointer deflection in the direction of rotation

Practice with diagrams

36 diagrams in Electrical (C-10) online practice

Read a sample diagram, choose an answer, then reveal the explanation. The online course includes diagram questions with feedback.

A six-circuit panel allocation model assigns explicit loads to two labeled supply legs.
Panel circuit-load allocation · Open full-size diagram

Try a sample question

What is total L1 connected load?

  1. 3,600 W
  2. 6,000 W
  3. 2,400 W
  4. 3,000 W
Show answer and explanation

A. 3,600 W

Use the assigned L1 column: circuits 1, 3 and 5 total 1,200 + 600 + 1,800 = 3,600 W.

California contractors who passed

Load calculation questions were the hardest for me. The diagrams in the study guide showed me how the parts connect, and after that the practice questions made sense.

Rafael Los Angeles, CA  · Electrical (C-10)

Some of the code language is hard even for people who speak English at home. The guide explained it in normal words.

Dimitar San Jose, CA  · Electrical (C-10)

Two weeks of practice exams after work and I passed.

Elmer Wilmington, CA  · Electrical (C-10)