CSLB Earthwork and Paving (C-12): Study Guide and Online Practice Exam
Promo pricing through September 30, 2026.
What’s included
- Learn the material: Earthwork & Paving (C-12) Study Guide Book
- Pass the test: Earthwork & Paving (C-12) Practice Exam
What this covers
Per the state's classification, a C-12 contractor "grades, clears, and prepares land surfaces; excavates, fills, and compacts earthwork, including grading for roads, streets, and other paved areas." This printed book covers the subjects the state tests. See the official CSLB C-12 classification.
Sample questions — Try our free practice test
-
A lime treatment is usually called for when the soil is:
A. Cohesive · ✓ B. Clay · C. Loam · D. Acid -
The minimum allowance in compaction is:
A. 80% · B. 85% · ✓ C. 90% -
A method that is generally accepted for improving soils is:
A. Compaction · B. Density and kneading action · ✓ C. Lateral or subdrainage -
Which of the following would be required when using blasting powder?
A. ability to read english · B. safety glasses · ✓ C. a permit to use it · D. all of the above -
When bell and spigot cast iron pipe is to be laid in a trench which has been mechanically excavated, the "bell-holes" are usually dug by:
A. a bulldozer · ✓ B. hand · C. a dragline · D. a trencher -
What is the next step after ripping, when ripping and re-compacting existing road?
A. spread the ripped asphalt · B. roll the ripped asphalt · C. crush the ripped asphalt · ✓ D. scrape the ripped asphalt into windows
California contractors who passed
Grading and compaction questions were the hard ones. The cross-section drawings in the guide explained it better than anything I found online.
The math questions worried me the most. The example drawings and the worked problems showed me how to set them up.
Passed. I liked that the practice exams are timed, because the real one goes fast.