What this book covers
The Peerless Landscaping (C-27) Study Guide Book prepares you for the trade portion of the California CSLB contractor license exam. Per the state's classification, a C-27 contractor constructs, maintains, and repairs plots and areas of land including hardscapes, drainage systems, irrigation, planting, and retaining walls. This printed book covers the subjects the state tests. See the official CSLB C27 classification.
Book chapters
- Site preparation
- Irrigation systems
- Fertilizers
- Plans & specifications
- Concrete & masonry
- Hardscapes
- Low voltage lighting
- Mathematics
- Safety
- Landscaping
Sample questions — Try our free practice test
-
Why would you not want to waterproof a retaining wall?
A. The water seeping through would discolor it · B. Water pressure would build up against the wall ✓ · C. It would become too wet on the low side · D. None of the above -
What drain design should you use when draining a large flat area?
A. Grid · B. Parallel · C. Radial · D. Concentric circle ✓ -
For a two-story building, how deep in the soil must the footings be?
A. 12" · B. 16" · C. 18" ✓ · D. 24"
California contractors who passed
Irrigation math was my weak point. After maybe six practice tests it finally clicked.
The drainage questions surprised me, but the guide has diagrams of the systems and I had studied them. Passed.
Two exams, one month, both passed. The practice tests told me when I was ready.