Free C-9: Drywall practice test

  • 15 questions
  • ~8 minutes
  • Scored instantly

15 questions from the Peerless Institute C-9: Drywall exam, including five questions about one diagram. The C-9: Drywall exam covers the following topics:

  • Planning and Estimating18%
  • Preparation, Framing, and Layout14%
  • Installation and Repair32%
  • Finishing17%
  • Safety19%

Percentages are approximate, per the CSLB examination content outline.

Study materials for this exam

0 of 15 answered
  1. 1A 158St25 stud is cut to order and contains 10 pieces to the bundle weighing 325 pounds per 1000 ft. What is its sectional depth? NOTE: Remember,the first three digits tell you the depth of the stud.

  2. 2ST25 steel studs and runners may be used for framing the openings up to _______ wide and may weigh not more than 100 lbs. maximum without reinforcement.

  3. 3The minimum width of gypsum studs for semi-solid partition framing shall not be less than _______ wide and 1 inch thick.

  4. 4When applying gypsum board, with the exception of when adhesive is being used for attachment, a room temperature must be maintained at not less than:

  5. 5A leg of what length will be used for 1/2" thick gypsum board, when using number 16 gauge flattened galvanized staples not less than 7/16" wide?

  6. 6A metal spreader blade which is 1/2" high and ____ wide minimum with notches spaced 1-1/2" to 2" o.c. should be used to apply sheet lamination.

  7. 7In partitions, walls or wall furring, the distance between control joints shall not exceed ____ feet on a straight wall, in accordance with ASTM C 844.

  8. 8Mr. Able is working on a 6' x 2.5' metal rolling scaffold that is 5' high. It has 6" rubber wheels & the floor has a 2 degree pitch. Mr. Able is finished at this location & needs to move to another and has his partner move it while he is still on it. He has proceeded:

  9. 9When applying sheet lamination, a metal spreader-blade ____ wide x 1/2" high minimum with notches spaced 1-1/2" to 2" o.c. should be used.

  10. 10Framing shall not be more than 16" on center for 1/2" gypsum wallboard and exterior gypsum soffit board and not more than ____ inch on centers for 5/8" thick gypsum wallboard and exterior gypsum soffit board.

Diagram practice

Use this diagram to answer the next five questions. Use the stated exercise data; the drawing is not to scale.

A metal-stud elevation has paired jamb members around a three-foot opening.
Metal-stud opening reinforcement · Open full-size diagram in a new tab
Diagram text description

A metal-stud elevation has paired jamb members around a three-foot opening. PEERLESS / DRYWALL C09-DX-01 Metal-stud opening reinforcement OPENING 4 ft 3 ft PROJECT DETAIL Stud framing plan elevation. Jamb pair on each side. Two pairs of jamb studs. Header at opening top. No structural capacity or rated assembly claimed. Diagram interpretation exercise • Not a construction document • Not to scale Two paired jambs bound the opening. The 4 ft dimension runs from the wall left end to the opening left boundary; the 3 ft dimension spans the opening itself.

  1. 11How many jamb members belong to the two shown pairs?

  2. 12What is the right opening boundary from the left datum?

  3. 13If the opening shifts left while width stays fixed, which members must be coordinated with the new boundary?

  4. 14What station marks the center of the opening from the left datum?

  5. 15Which labeled member spans the top of the opening?