15 questions from the Peerless Institute C-21: Moving & Demo exam, including five questions about one diagram. The C-21: Moving & Demo exam covers the following topics:

  • Planning and Estimating25%
  • Project Preparation20%
  • Building Moving13%
  • Structure Demolition21%
  • Safety21%

Percentages are approximate, per the CSLB examination content outline.

Study materials for this exam

0 of 15 answered
  1. 1Scaffolding platform planks shall be secured against slipping from supports, but not sloped more than how many feet vertically to 10 feet horizontally?

  2. 2Tree and shrub root with roots between 1/2 and 1-1/2 shall be removed to depth of not less than ___ft. below natural ground line.

  3. 3If a requisition for nails stated: "100 lbs., 10d, 3 inch, common wire nails, galvanized", what portion of the requisition was not necessary?

  4. 4A construction job states in the specifications that the content of cement shall not exceed 7 1/2 sacks nor be less than 6 sacks per cu. yd. of concrete. Therefore, the ratio of the number of sacks of cement per cubic yard of concrete is called:

  5. 5A wrecking ball may not weigh more than 50% of the clamshell rating or what percentage of the rope yield strength?

  6. 6A job is estimated to take 3,840 hours and there is a crew of 8 workers. The work is to be completed in 3 weeks. After 2 weeks 50% of the work has been completed. If the workers are to work a 40 hour week, how many additional workers are needed?

  7. 7The specs for a job state that the contractor is to receive payment at $6.00 per lineal foot for earth borings and $7.50 per lineal foot for rock borings. Additionally, he will be paid $150 toward the cost of transporting drilling equipment to the site, setting up the equipment, dismantling and transporting it away from the site. An additional boring through 40 feet of earth and 5 feet of rock is ordered; the contractor should then receive:

  8. 8The weight of a 19" x 18" x 2" steel base plate is ___ lbs., if the steel weighs 480 lbs. per cubic foot.

  9. 9When demolition activities cause toxic dust, which of the following is not a building code requirement?

  10. 10Flooring boards may be removed from not more than ___ above grade to provide storage space for debris, providing falling material is not permitted to endanger structural stability.

Diagram practice

Use this diagram to answer the next five questions. Use the stated exercise data; the drawing is not to scale.

Building footprint with three parallel beams and six crib positions.
Building move beam-and-crib layout · Open full-size diagram in a new tab
Diagram text description

Building footprint with three parallel beams and six crib positions. Building move beam-and-crib layout Building-moving support plan • Dimensions and states shown govern this exercise • Not to scale C C C C C C 8 ft 8 ft Plan • three transfer beams • C = crib position Illustrative supported weight: 48,000 lb, equal beam shares assumed. EXERCISE BASIS Plan locations only; member/crib capacities not supplied. Equal load share is an exercise idealization. Within the building footprint, three parallel vertical beam lines run left to right at 8 ft spacing. Each beam has two rectangular C crib positions, for six shown positions. Notes supply a supported weight of 48,000 lb with equal beam shares assumed.

  1. 11Under the stated idealization, what load is allocated to each beam?

  2. 12What is the center spacing from first to third beam?

  3. 13Can this diagram alone establish crib capacity?

  4. 14How many crib positions marked C are shown in the plan?

  5. 15What total illustrative weight is allocated to two of the three beams under the stated equal-share assumption?