Free Painting & Decorating (C-33) practice test

  • 10 questions
  • ~5 minutes
  • Scored instantly

10 questions from the Peerless Institute C-33 Painting exam. Covers surface preparation, coating systems, VOC limits, and application techniques.

0 of 10 answered
  1. 1A ladder is sold in three grades: Type 3 or household grade, Type 2 or commercial grade and Type 1 industrial grade. Type 2 is rated at:

  2. 2The employee, if he is going to file a claim for loss of wages due him because he was laid off or discharged for refusing to work under a safety violation, must notify his employer within ____ days that he filed a claim with the Labor Commissioner & then file within 30 days.

  3. 3Based on a P & L Statement showing direct costs equals $6500, overhead equals 25 percent, and profit equals 20 percent. The correct bid is:

  4. 4All lumber used in construction of scaffolds shall be Douglas Fir, not less than construction grade or material of equal strength.

  5. 5If the Division of Industrial Safety receives a complaint of a serious violation from an employee alleging that his place of employement is unsafe and either death or serious harm could result from a condition which exists, then the Division must investigate not later than:

  6. 6Ladder-jack scaffolds shall not be above the ground higher than:

  7. 7Airless spray equipment operates from 1300 to 6000 psig. However, for the MOST effective operation in spraying houses inside and outside, it is recommended to have a gun with a pump which will allow operation at:

  8. 8The net cost for materials is $3,125 and the labor estimate is $10,938 What is the profit amount if it is 20 percent of the material and labor estimates?

  9. 9If 1640 bricks cost 40 cents each and a contractor receives a 10 percent discount and there is an 8.5 percent tax, what is the final cost?

  10. 10If 48 gallons of paint are purchased at $21.85 per gallon with discounts of 15 percent, 10 percent and 4 percent, what is the final cost?