Skip to content

CSLB Concrete (C-8): Study Guide and Online Practice Exam

$250.00 $300.00 Save $50.00 Free Shipping

30 diagrams in Concrete (C-8) online practice

What’s included


What this covers

Per the state's classification, a C-8 contractor "forms, pours, places, finishes and installs specified mass, pavement, flat and other concrete work; and places and sets screeds for pavements or flatwork." This printed book covers the subjects the state tests. See the official CSLB C-8 classification.


Sample questions: Try our free practice test

  1. Concrete is kept moist to enhance:
    A. Cooling · B. Heating · C. Water tightness · ✓ D. Curing
  2. Proper curing will help produce concrete that is:
    A. Hard · ✓ B. Water tight · C. Prestressed · D. Frozen
  3. A material that may be used for curing is:
    A. Asphalt paper · B. Plaster board · C. Plywood · ✓ D. Waterproof paper or plastic
  4. A 6 cu. yd. load of concrete weighs 22,842 lbs. What is the unit weight of the concrete?
    A. 121 lb./cu. ft. · ✓ B. 141 lb./cu. ft. · C. 282 lb./cu. ft. · D. 564 lb./cu. ft.
  5. 6 × 6 – 10 × 10 welded-wire fabric has:
    A. 10-inch wire spacing · ✓ B. unequal wire spacing · C. 6-inch wire spacing · D. No. 6 gauge transverse wires
  6. A caisson is:
    ✓ A. a cast-in-place pile · B. an underwater footing · C. a continuous footing · D. none of the above

Practice with diagrams

30 diagrams in Concrete (C-8) online practice

Read a sample diagram, choose an answer, then reveal the explanation. The online course includes diagram questions with feedback.

A slab plan splits two adjacent rectangular placement zones of different total depths.
Stepped slab placement zones · Open full-size diagram

Try a sample question

What is Zone A volume, rounded to .01 yd³?

  1. 7.90 yd³
  2. 11.85 yd³
  3. 3.95 yd³
  4. 5.93 yd³
Show answer and explanation

C. 3.95 yd³

20×16×4/12÷27 = 3.95 yd³.

California contractors who passed

I have poured concrete for years, but the test asks about codes, not just work. The guide taught me that part.

Ruben Berkeley, CA  · Concrete (C-8)