CSLB Concrete (C-8): Study Guide and Online Practice Exam
30 diagrams in Concrete (C-8) online practice
What’s included
- Learn the material: Concrete (C-8) Study Guide Book
- Pass the test: Concrete (C-8) Practice Exam
What this covers
Per the state's classification, a C-8 contractor "forms, pours, places, finishes and installs specified mass, pavement, flat and other concrete work; and places and sets screeds for pavements or flatwork." This printed book covers the subjects the state tests. See the official CSLB C-8 classification.
Sample questions: Try our free practice test
-
Concrete is kept moist to enhance:
A. Cooling · B. Heating · C. Water tightness · ✓ D. Curing -
Proper curing will help produce concrete that is:
A. Hard · ✓ B. Water tight · C. Prestressed · D. Frozen -
A material that may be used for curing is:
A. Asphalt paper · B. Plaster board · C. Plywood · ✓ D. Waterproof paper or plastic -
A 6 cu. yd. load of concrete weighs 22,842 lbs. What is the unit weight of the concrete?
A. 121 lb./cu. ft. · ✓ B. 141 lb./cu. ft. · C. 282 lb./cu. ft. · D. 564 lb./cu. ft. -
6 × 6 – 10 × 10 welded-wire fabric has:
A. 10-inch wire spacing · ✓ B. unequal wire spacing · C. 6-inch wire spacing · D. No. 6 gauge transverse wires -
A caisson is:
✓ A. a cast-in-place pile · B. an underwater footing · C. a continuous footing · D. none of the above
Practice with diagrams
30 diagrams in Concrete (C-8) online practice
Read a sample diagram, choose an answer, then reveal the explanation. The online course includes diagram questions with feedback.
Try a sample question
What is Zone A volume, rounded to .01 yd³?
- 7.90 yd³
- 11.85 yd³
- 3.95 yd³
- 5.93 yd³
Show answer and explanation
C. 3.95 yd³
20×16×4/12÷27 = 3.95 yd³.
California contractors who passed
I have poured concrete for years, but the test asks about codes, not just work. The guide taught me that part.