CSLB Glazing (C-17): Study Guide and Online Practice Exam + Law and Business Study Guide and Online Practice Exam
$375.00
$525.00
Save $150.00
What’s included
- Learn the material: Glazing (C-17) Study Guide Book
- Pass the test: Glazing (C-17) Practice Exam
- Required for all California contractor applicants: Law & Business Study Guide Book and Law & Business Practice Exam
What this covers
Per the state's classification, a C-17 contractor selects, cuts, fits, and installs all types of glass, glazing, and related materials including curtain walls, storefronts, and structural glazing systems. This printed book covers the subjects the state tests. See the official CSLB C-17 classification.
Sample questions — Try our free practice test
-
Glass is installed in unit walls:
A. In the shop · B. Inside the building · C. Outside the building · ✓ D. At the factory -
The maximum area of any single piece of glass in a safety glazing location is:
A. 4 sq. ft. · ✓ B. 6 sq. ft. · C. 8 sq. ft. · D. 10 sq. ft. -
Which of the following materials should not be used as a glazing surface?
A. Stone · ✓ B. Aluminum · C. Brick · D. Concrete -
When shifting the position of a lite of glass you should use:
✓ A. suction cups · B. a crowbar · C. a screwdriver · D. any of the above -
What is the typical "bite" of 3/4 inch monolithic glass?
A. 1/2" · ✓ B. 5/8" · C. 3/4" · D. 1" -
Lateral shims are used to control:
✓ A. face clearance · B. bite clearance · C. edge Clearance · D. all of the above -
[Law & Business] A construction contract was written containing the following time estimates to complete the job. It would take 2 days to ready the construction site and then the job itself would be done in 2 phases. The first phase would take 10 days and the second would take 7 days, but these 2 phases could be at the same time. It would take one additional day at the end to clean up. How many days would it take to complete this project?
A. 15 days · ✓ B. 13 days · C. 11 days · D. 7 days -
[Law & Business] A contractor receives a notice from the Employment Development Department (EDD) that one of his former employees has filed a claim for Unemployment Insurance (UI) benefits against his reserve account. He/she may:
A. call EDD within 5 days and protest · ✓ B. protest, in writing, within 10 days of the mailing date of the notice · C. protest, in writing, within 30 days of the mailing date · D. protest, in writing, within 45 days of the mailing date
California contractors who passed
I studied in the truck between jobs. Passed both exams in the same month.
Glazing has a lot of small standards to remember. The practice questions made them stick.
Very good for the business side. Contracts, bonds, and insurance were all explained in a way I could follow.