15 questions from the Peerless Institute General Building (B) exam, including five questions about one diagram. The General Building (B) exam covers the following topics:

  • Planning and Estimating15%
  • Framing and Structural Components20%
  • Core Trades30%
  • Finish Trades20%
  • Safety15%

Percentages are approximate, per the CSLB examination content outline.

Study materials for this exam

0 of 15 answered
  1. 1A block wall needs 22 blocks per course and has 13 courses. If blocks cost $2.00 each and sales tax is 8.25%, what is the total material cost?

  2. 2An 8-inch-thick wall has a total length of 130 lineal feet and is 8 feet high. What is the cubic footage of the wall?

  3. 3A crew of three spends 8 hours framing 120 linear feet of exterior wall at a labor cost of $1,412. What is the labor unit price per linear foot?

  4. 4Wall board compound is needed at 8 lbs per 100 sq ft of wall. For a 12 ft × 10 ft room with 8 ft walls, how much compound is required?

  5. 5In plumbing, what is the maximum number of fixture units that can be connected to a 2-inch vent pipe?

  6. 6A 5/8-inch manila rope will break under a load of approximately:

  7. 7Domestic gas piping shall withstand a test pressure of not less than ____, or may be tested at a pressure of at least ____ inches of mercury.

  8. 8A capacity plate must be posted in an elevator car and the hoist ropes inspected with records kept. How often must the ropes be inspected?

  9. 9A construction elevator, as well as stairways, are required for structures ____ feet or more below ground level, or ____ feet above ground.

  10. 10A mobile crane may be loaded to only 50 percent of its rated capacity. What load is allowed on a 30-ton crane?

Diagram practice

Use this diagram to answer the next five questions. Use the stated exercise data; the drawing is not to scale.

Existing floor EL 100.00 ft; addition structural deck EL 99.50 ft. Section notes: topping 4 in and finish 1/2 in. Finish schedule: 1 in. Door-head underside EL 106.75 ft.
Addition floor-elevation tie-in · Open full-size diagram in a new tab
Diagram text description

Existing floor is left, addition is right. The addition deck is below the addition finish layer. Existing floor: EL 100.00 ft; addition deck: EL 99.50 ft; section topping: 4 in; section finish: 1/2 in; finish schedule: 1 in; target: flush finished floors; door-head underside: EL 106.75 ft. No deflection or structural capacity is established. PEERLESS / GENERAL BUILDING B-DX-01 Addition floor-elevation tie-in EXISTING FINISHED FLOOR EL 100.00 ft Addition structural deck: EL 99.50 ft Door head underside: EL 106.75 ft Δ Addition finish PROJECT DETAIL Tie-in section A-1. Existing floor: 100.00 ft. Addition deck: 99.50 ft. Specified topping: 4 in. Floor finish: 1/2 in. Target: flush finished floors. Finish schedule: 1 in. No deflection / structural capacity is established. Diagram interpretation exercise • Not a construction document • Not to scale The addition deck is below its finish layer; the existing floor is on the left and the addition is on the right.

  1. 11Using the section’s half-inch finish and 4-in topping, before resolving the schedule conflict, what is the addition finished-floor elevation?

  2. 12Using the section-based calculated elevation, if the finished addition floor is raised to EL 100.00 ft while the door head stays fixed, what happens to the geometric door-head clearance?

  3. 13Which document conflict must be resolved before fixing the addition floor build-up?

  4. 14Using the section’s 4-in topping and half-inch finish, what geometric clearance remains below the door head?

  5. 15If the schedule’s 1-in finish is used with the 4-in topping, how far below the existing finished floor would the addition finish be?